Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Contact Details
-
Site managers name
-
Site managers contact number
Site operating hours
Powerstar Type
-
Powerstar Type Required
-
Powerstar specified match demand
-
HMW required ( 3rd zigzag winding to reduce harmonics - optional )
-
HMI required ( IP address metering system - optional )
-
GSM comms required
-
Under-voltage controller type
-
Bypass switch required ( BBM recommended )
-
If the unit is to be positioned outside is a GRP housing required
Supply Details
-
Electricity Supplier
-
Electricity Supplier contact number
-
MPAN number
-
Metered on which side
-
Is Transformer owned by client
-
Add picture of main incomer
Panel meter or main meter spot reading
-
Enter meter type
-
Enter meter manufacturer
-
Enter meter serial number
-
Add picture of meter
-
Does meter allow engineer readings
-
Total kVa
-
Total kW
Logger Details and Spot Readings
-
Logger ID (head)
-
Logger location (head)
-
Logger ID (eol)
-
Logger location (eol)
-
Location of spot read 1
-
Location of spot read 2
-
Location of spot read 3
-
Location of spot read 4
-
Location of spot read 5
-
Location of spot read 6
Eligible Load for Carbon Trust
-
Add pictures of devices
In eligible load for PowerStar
-
Add pictures of devices where appropriate
Large Motor Details
-
Add make model and operating voltage of any 3ph / 440v lift motors
-
Add picture of lift motors if possible
-
Add make, model and operating voltage of any rotisserie
-
Add picture of rotisserie
-
Add make, model and voltage of ovens
-
Add picture of ovens
Site Plan
-
Will an install survey be required
-
Add measured plan of VO location including height
-
Add location pictures
Site Access Description
-
Describe any restrictions along access route from entrance to building to location of VO
-
Add pictures of any restrictions
Additional Information
-
Add any additional relevant information
-
Surveyors signature