Title Page

  • Conducted on

  • Prepared by

  • Client

  • Survey Type

  • Location

Residents Details

  • Client Details

  • Residents Name

  • Site Address (including post code)
  • Customer Supplier

  • Telephone Numbers

  • Email

  • Best days for installation

  • Any working time constraints

  • What times are not suitable?

Property Details

  • Property Type

  • Construction Type

  • Age Band

  • Listed Building/ Conservation Area

  • Should the planning department be notified? Has the County councils website been checked at point of survey?

  • Access required to rear

  • Location of rear access?

  • Please show scaffolding lifts in relation to property

Structural

  • Roof Style

  • Tile Type

  • Tile Description (clay or concrete, internlocking or lapped)

Roofing and Scaffold

  • Scaffold Location

  • Height of Eaves?

  • Access to rear?

  • Location of rear access

  • Length (along gutter) Metres

  • Height (up roof slope) Metres

  • Pitch ° degrees

  • Height of Roof Above Eaves?

  • Orientation from South (south = 0º East = West =+) degrees

  • Roof type

  • Rafter/Truss Centres

  • Size of Rafters/Top Chord of Truss

  • Number of Trusses/Rafters

  • For cut roofs only

  • Size of purlin

  • Number of Purlin supports

  • Maximum Unsupported Rafter Length

  • Notes

  • Timber Condtion

  • Felt Condition

  • Observations (e.g holes in felt around gas flue)

  • Loft Condition

  • Any Issues With Loft access

  • Loft Headroom Meters

  • Temporary Loft Light Required

  • Temporary Loft Walkway Required

Electrics

  • Consumer Unit Make and Model (e.g. Crabtree, Starbreaker)

  • Breaker Type

  • Location

  • Distribution Board Upgrade?

  • Spare Way for PV

  • Additional Garage DB for PV

  • Earthing to Gas Meter

  • Gas Meter Location

  • Earthing to Water Main

  • Water Location

  • Earthing Type

  • Notes

Import Meter Type

  • Meter Type

  • Does Meter require changing?

  • Make and Model of Meter

  • Meter Serial Number

  • Is the MPAN Number Present

  • Is there room for the 4 pole isolation switch next to the existing meter

  • What action is required to fit an isolator?

  • Import Meter Location

  • External

  • Next to Distribution Board

  • Notes

  • Generation Meter Location (Proposed)

Photovoltaic System Proposed

  • Inverter Location

  • Can a 600 x 780 board fit on wall and through internal roof access

  • Cellular Networks Checked?

  • Notes

Risk Assessment

  • Notes/Problems Identified

  • Does the main power cable to the property need sheathing before scaffold erected?

  • Take Photos

  • Has a structural survey been completed in respect of PV installation?

  • Is there any suspected Asbestos that requires investigation

  • Take Photo of Suspected Area.

Photo Checklist

  • Property Elevations, Front Door & Scaffold Access

  • Suitable Roof Elevation Close Up including gutter

  • Proposed Inverter Location

  • Roof Void if relevant including TV ariel

  • Consumer Unit and Close up of Breakers

  • Electricity Meter & Mains Fuse / Earth in Meter Box

  • Water main bond

  • Gas Main bond (if applicable)

  • Satellite dish (if any) including closeup of bracket

Shading

  • Has SunEye Survey been completed

  • Notes

Sign Off

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.