Title Page
-
Conducted on
-
Prepared by
-
Location
-
Week Commencing:
-
Contract Name:
-
Contract No:
MANAGEMENT
-
Site Presentation:
-
General Housekeeping
-
External signage adequate
-
Public Safety around site OK
-
How will this be improved?
-
Health & Safety policy displayed
-
-
F10 in date
-
Health & Safety plan up to date
-
HSE poster displayed
-
All on site Inducted
-
ID badges on person
-
Visitors and Operatives signing in and out daily.
-
Risk Assessments relevant
-
COSHH Assessments relevant
-
Young Workers R/A completed
-
Are Tradespersons Competence Certs in order?
-
Are First aid kits in date and sufficiently stocked for number of operatives working on site.
-
Suitable and sufficient First Aiders on site
SCAFFOLD
-
First inspections, 7 Day, adaption and Adverse weather inspections completed on all scaffolds?
WORK AT HEIGHT
-
Barriers adequate
-
Harness being worn
-
Proper access / egress
-
MEWP’s – trained personnel
SKIPS
-
Is skip in suitable location?
-
Skips not overloaded
-
Fenced if left unattended
-
No hazardous materials in General Waste skips
TRAFFIC
-
Pedestrian routes provided and signed
-
Controlled access onto site
-
Is the traffic management plan suitable?
WELFARE
-
Canteens clean
-
Drying room clean and clear
-
Hot water Washing / toilet facilities
-
Microwave / heating meals up
-
Smoking arrangements
TENNANT SAFETY
-
Safe access/egress for Tenants and General Public
-
Clear of hazards, No waste left in garden or path
-
All Rubbish removed
-
Carpet protection if used in good condition
-
Tenants health risks addressed, dust, fumes etc
PPE (worn)
-
PPE Register up to date (F122)
-
Safety Helmets being worn and in date
-
Ear protection suitable and sufficient
-
Respirator (dust mask) FFP3 suitable and sufficient?
-
Operatives face fit tested?
-
Eye protection suitable and sufficient?
-
Gloves suitable and sufficient?
-
Branded LCX High-viz vest being worn by operatives?
-
Safety footwear being worn by all operatives
GAS (inc LPG) + HOT WORK
-
Hot works permits issued and returned? (F149)
-
Fire Extinguishers on site suitable and in date?
-
Operatives Gas Safe registered if required?
FIRE
-
Site Fire Plan up to date
-
Emergency procedures displayed
-
Fire Risk Assessment reviewed
-
Fire alarm system available / air horn or fire bell
-
Fire Muster point determined
-
Extinguishers in date?
POWER TOOLS/ELECTRICITY
-
Power tools general condition / hoses / connections / gauges
-
Actions Required
-
Battery or 110V -- NO 240V
-
Actions required
-
Leads and extension cables safe and undamaged?
-
Power tools guards / dead man's switch in good working order
-
3 month PAT test in date
SIGNAGE
-
All safety signage in place?
-
External site safety signage in place?
-
Road signs suitable for operations
HEALTH HAZARDS
-
Dust/Fumes sufficiently managed?
-
Noise / vibration sufficiently managed?
-
Manual Handling sufficiently managed?
-
Chemicals sufficiently managed under COSHH?
-
Sharps risk identified and sufficiently managed, operatives notified?
ASBESTOS
-
Surveys on site, relayed to operatives and accessible?
-
Asbestos Permit in operation if required?
-
Licensed contractors insurance checked if applicable?
-
Disposal arrangements compliant
TRAINING
-
Competence Certificates in order CSCS etc.
WORKING AREAS
-
Site Compound area access safe
-
Adequate task lighting
-
Materials and equipment safely stored and tidy appearance
-
Barriers erected to protect work area where necessary-excavations
-
Safety signage relevant to work and visible?
INSPECTOR
-
-
Signature of Inspector:
-
Print Name: