Inspection Information
-
Conducted On:
-
Location:
-
Well #:
-
AFE #:
-
Statoil Site Representative:
-
Statoil Safety Representative:
-
Contractors Working on Location:
-
Equipment on Location:
-
Status of Operations:
Inspection Check List
Signage:
-
Safety Billboard in Place?
-
PPE & FRC's signage in Place at Entrance?
-
Lease Signs in Place?
-
No Smoking Signage at the Entrance of Location?
-
Confined Space Labels in Correct Location on Tanks?
-
Tanks Labeled with Placards in Place?
-
Chemical Pump Room Labeled?
-
LACT Unit Building Labeled?
-
Separator Building Labeled?
-
Saltwater Pump Room Labeled?
-
Heater Treater Building Labeled?
-
Generator Fuel Tank Labeled?
-
Electrical Room Labeled?
-
Electrical Breakers Properly Indicated?
-
Electrical Board Panels with Warning Labels in Place?
-
Pumping Unit Safety Warning Labels in Place?
-
All Containers Labeled with their Contents?
-
Hearing Protection Signage in Place?
-
Automatic Start Signage in Place?
-
Stay Off Berm Signage in Place?
Applicable Permits
-
JSA / SJA Completed with Contractor Sign-in Sheet?
-
Ground Disturbance Permit Completed?
-
Hot Work Permit Completed?
-
Confined Space Permit Completed and Posted?
-
Critical Lift Permit Completed?
General Site Inspection:
-
Interior / Exterior Berm in Place?
-
Knife Gate Valve Closed and Secured with Lock & Chain?
-
Dead Man Marked / Visible and within its Life Expectancy?
-
Pumping Unit Safety Guards in Place, Ladders with Fall Protection Cage?
-
Ignitor Wire Functioning?
-
All Caps and Plugs in Place?
-
Plumbing Appeared to Teflon Tape on all Threads?
-
Heater Treater Ladder with Fall Protection Cage in Place?
-
Tanks, Walkways, Stairs Properly Grounded?
-
Grounds Available for Transport while Loading and Unloading?
-
Stairs and Catwalk Secured on Tanks with Two Threads Showing on Bolts?
-
Adequate Hand-Rails Provided on Stairs and Catwalk?
-
Windsock Up and Visible and in Good Shape?
-
Are Chemicals Stored Properly with MSDS Available?
-
Electrical Covers in Place?
-
Location Clean with Pathways Clear (No Obstructions)?
Contractor Inspection
-
All Crew Members Wearing Proper PPE & FRC's?
-
H2S Monitors Being Utilized?
-
Fall Protection Being Utilized?
-
Utilizing Safety Glasses/Grinding Shields while Grinding?
-
First Aid Kit Available on Location?
-
Fire Extinguishers Available with Monthly / Annual Inspection Completed?
-
Crew Utilizing Proper Tools for Job Functions?
-
Crew Using Proper Lifting Techniques?
-
Tools with Safety Guards in Place?
-
Good Housekeeping with Work Area Clean and Organized?
-
Crew Utilizing Proper Lockout / Tag Out?
-
Roll Over Protection in Place with No Obvious Defects?
-
Fire Watch Being Utilized?
-
Spotter Be Utilized while Equipment is in Operations?
-
Backup Alarms on Equipment Working Properly?
-
Does Contractor Equipment on Location Appear to Have Any Fluid Leaking?
-
Does Contractor Equipment on Location Have Seat Belts (Being Utilized by Operator)?
-
Are Pipe Thread Cuttings be Collected?
-
Are Chock Blocks Being Utilized?
-
Are Compressed Cylinder Tanks Secured Upright with Valve Caps in Place?
-
Proper Rigging Techniques are Being Utilized while Lifting Loads?
-
Inspected Tag Lines are Being Utilized when Lifting Loads?
-
Rigging Equipment Appears to be in Good Working Condition?
Contractors Excavating and Trenching
-
Caution Tape / Barriers Fencing Off Around Open Pits and Trenches?
-
All Bell Holes are Properly Sloped and/or Benched?
-
Ladders, Steps, or Ramps Located in Bell Hole so No More than 25ft of Lateral Travel is Required?
-
Excavated Soil, Other Material, Or Equipment are Stored at Least 2ft from the Edge of the Excavation?
General Facility Inspection (Office, Pipe Yard, SWD, Oil Facilities)
-
First Aid Kits are Up to Date and Available?
-
Eye Wash Station Up to Date and Available?
-
Hearing Protection Available?
-
Flammable Storage Cabinet Being Utilized?
-
MSDS Binders at Location with Updated MSDS Sheets?
-
Are Combustibles Being Kept in Electrical Room?
-
Is all Electrical Wiring Incased in Conduit with Covers in Place?
-
Are Rubber Mats in Place on Flooring of Electrical Building?
-
Oil Facility Pressure Relief Valve was in the Locked Open Position?
-
Are All Transformers Enclosed with Safety Barrier (Bollards)?
-
Underground Injection Control (UIC) Permit Available?
-
Spill Prevention Control and Countermeasure Plan (SPCC) Available?
-
Facilities Response Plan (FRP) Available?
-
Fire Extinguishers Available with Monthly/ Annual Inspection Completed?
Additional Findings
Additional Findings or Concerns:
-
Issue #1:
-
Add media
-
Issue #2:
-
Add media
-
Issue #3:
-
Add media
-
Issue #4:
-
Add media
-
Issue #5:
-
Add media
-
Issue #6:
-
Add media
-
Issue #7:
-
Add media
-
Issue #8:
-
Add media
-
Issue #9:
-
Add media
-
Issue #10:
-
Add media
Approval
-
Safety Representative:
-
Add signature
-
Consultant / Company Man:
-
Add signature
-
Contractor Supervisor / Foreman:
-
Add signature
-
Person In Charge (PIC):
-
Add signature