Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Manufactured Internal or External?
-
Supplier Name
-
Project Number
-
Image of Machine
Factory Acceptance Test
Documentation
-
Is machine nameplate or identifier visible?
-
Machine Identification Image
-
Is machine marked with either CE or UKCA?
-
Calibration Certs present?
-
MSDS Available?
-
Are all required technical drawings available?
-
Ask supplier to email technical drawing pack
Function
-
Please State any Special Instructions
-
Has supplier or User successfully demonstrated all aspects of the machine working?
-
Integration Connection Types
-
Conforms with technical drawings and all parts are identified/labeled?
Maintenance & Training
-
Are installation, maintenance and user manuals available?
-
Training documentation/materials made available?
-
Critical Spares
-
Standard Maintenance Procedure
-
Service Requirements
Health and Safety
-
Are guard doors present and accessible, with relevant interlocks where needed?
-
Are emergency stop buttons present and in good locations?
-
Is special fire suppression equipment required?
-
Hazard Identification Present on Equipment?
-
COSHH Requirements?
-
Is the equipment ergonomic?
Logistics
-
How are we are going to transport it?
-
How much does it weigh?
-
Is it packaged?
-
Handling Equipment Required at Magtec?
-
Is there special considerations for materials and environment?
Sign Off
-
Are we confident enough to bring this machine onsite?
-
Please Sign FAT
-
Please Date FAT