Title Page

  • Site conducted

  • Equipment Manufacturer

  • Manufacturing Facility Location

  • Serial Number

  • MCC Representative

  • Conducted on

Factory Acceptance Test (FAT)

Pre-Factory Acceptance Test Checklist

Factory Acceptance Test Protocol

  • Are all certificates of compliance available?

  • Are all technical documents and drawings available?

  • Are all calibration certificates available (i.e load cells)?

  • Recommended spare parts lists?

  • Are training materials available?

Factory Acceptance Test Preparation

  • Safety Inspection

  • Are guard doors accessible and easy to use?

  • Are emergency stop buttons in good locations?

  • Are all interlocks functioning?

  • Are there audible/visual warning indicators prior to machine movement?

  • Are adequate machine guards in place?

  • Are electrical hazards clearly marked?

  • Are pinch points clearly marked?

  • Are machinery nameplates with contact information visible?

Hazard Assessment

  • Does the operation of this machine create dust?

  • Does the operation of this machine create any hazardous waste?

  • Is hazardous waste properly contained?

  • Is the noise level at or below safe levels (70 dBA)?

  • Is hearing protection available?

  • Is there any lifting above 50 pounds?

  • Is there a lifting device available?

  • Ergonomic Assessment

  • Are there carts, dollies, or other aids needed to use this machine?

  • Describe carts, dollies or aids needed for operation

  • Are FAT personnel trained on safe lifting techniques, uses, and carrying devices?

  • Are FAT personnel knowledgeable about ergonomics policies and procedures?

  • Does operation require any awkward positions of personnel?

  • What corrections need to be made?

Factory Acceptance Test Checklist

Factory Acceptance Test Personnel

  • Were pre-tests conducted by the manufacturer?

  • Were any corrective actions identified during pre-tests?

  • Validate the corrective actions.

  • Do the design engineers and fabrication manager agree that the equipment is ready for FAT?

  • Are all FAT personnel equipped with the right PPE?

Factory Acceptance Test of Equipment

  • Startup process

  • Safety

  • Control System

  • User Interface

  • Performance, net speed of 200 MPM sustained for 1 hour or roll of material.

  • Run at 660 MPM to evaluate the print to cut accuracy

  • Determine what speed will maintain the +/-0.008" and document.

  • Dykem Test for K&B unit

  • Please provide a video of the turret operating at maximum speed.

  • Print to cut accuracy +/-0.008"

  • Automatic slit positioning accuracy +/- 0.004"

  • Turret automatic splicing between labels +/- 1.25mm

  • Automatic print and apply to finished roll.

  • The finished roll profile, must not be dished.

  • Does unwind perform as designed at maximum speed?

  • Shutdown process

Post-Factory Acceptance Test Checklist

  • Punch List

Completion

  • Additional observations

  • The equipment has been produced according to the specifications of the client. Since the equipment reliability has been verified, it is scheduled for delivery and installation at the site of the client.

  • Full Name and Signature of receiving plant Operations Manager

  • Full Name and Signature of Vice President Engineering & Optimization Americas CPG

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.