Title Page
-
Date
-
Site ID
-
Hyper Ref
-
Address
-
Building Name
-
Splicer
Pre-Work Checks
-
Are You Able To Complete Works On This Site Today?
-
Reason For No Works Being Completed? Show Evidence In Images, Leave Not If Access Required.
-
Evidence Incorrect Works / No Equipment On Site
-
Image Of Cable Coils In FDP's Ready For Splicing
Works
c-OLT Splicing
-
Location Of c-OLT - Add Image In Media
-
Show Fibers Spliced To Pigtails Of Splitter
-
Can You Confirm Splices Have A Loss Of Less Than 0.03 DB
-
Can You Confirm All Connections Have Been Inspected And Cleaned
-
Can You Confirm All Fibre Drops Have Been Labelled Correctly - Add Image In Media
-
Can You Confirm With An Image All Patch Cables Are Neatly Routed With Good Bend Management
-
Can You Confirm All Fibres Routed And Secured Correctly In The Fibre Management Tray
Enclosure
-
Enclosure Number
-
Enclosure Location
-
Tray Number
-
All Customer Drops Have Been Spliced As Per Connection Path
-
Tray Status (Add What Was Spliced In Notes)
- Complete - Followed Splice Plan
- Complete - Authorized Splice Re-Plan
-
Image Of Tray Work (show Labeling)
-
Can You Confirm All Connections Have Been Inspected And Cleaned
-
Can You Confirm All Fibre Drops Have Been Labelled Correctly
-
Can you Confirm A 1:16 Splitter Has Been Installed Correctly
-
Splitter Serial Number
-
Image Of Splitter Serial Number & Location In Enclosure
-
I have Red Lighted Back To The OLT And Can Confirm The Fibre Is On The Correct Port As Per Splice Path
-
I Can Confirm I Have OTDR Tested Back To the c-OLT And My Results Have Been Uploaded To The Cloud
-
Job Outcome
- Complete - Followed Splice Plan
- Complete - Authorized Splice Re-Plan
- Incomplete - See Pre-Works Checks
- Part Complete - See Pre-Works Checks (Missing Cable)
Sign Out
-
I Can Confirm All Works Completed Have Been Carried Out To A Hyperoptic Standard