Title Page
-
Site conducted
-
Date and time
-
Location
-
Client
PPE INSPECTION
-
Climbing helmet with 2 point chin strap
-
Photo Evidence
-
Eye protection
-
Photo Evidence
-
Hearing protection
-
Photo Evidence
-
Dust masks FFP3 only
-
Photo Evidence
-
Safety boots
-
Photo Evidence
-
Gloves
-
Photo Evidence
-
Client branded Hi -vis
-
Photo Evidence
-
In date first aid kit Inc. eyewash
-
Photo Evidence
-
Correct clothing
-
Photo Evidence
-
Services locator
-
Photo Evidence
-
Storage bag
-
Photo Evidence
-
Overall condition
SAFETY EQUIPMENT
-
Ladder standoff
-
Photo Evidence
-
Anti slip ladder mat
-
Photo Evidence
-
Cones/barriers
-
Photo Evidence
-
Adequate CFL signage
-
Photo Evidence
-
Health and safety document folder
-
Photo Evidence
-
Overall condition
PERSONAL FALL PROTECTION EQUIPMENT (PFPE)
-
2 POINT FULL BODY HARNESS
-
Photo Evidence
-
Date of first use
-
Date of manufacture
-
Unique serial number
-
Inspection
-
COWSTAIL LANYARD
-
Photo Evidence
-
Date of first use
-
Date of manufacture
-
Unique serial number
-
Inspection
-
SKR GUIDED ROPE GRAB
-
Photo Evidence
-
Date of manufacture
-
Unique serial number
-
Inspection
-
10M KERMANTLE ROPE
-
Photo Evidence
-
Date of first use.
-
Date of manufacture.
-
Unique serial number
-
Inspection
-
10 MM EYEBOLTS
-
Photo Evidence
-
Inspection
-
2 x 10 M RATCHET STRAPS
-
Photo Evidence
-
Inspection
-
YELLOW STORAGE BAG
-
Overall condition
EXTENSION LADDERS
- Extension Ladders
-
Ladder ID name
-
Ladder Class (EN131 or Class 1)
-
Inspection tag displayed (All section)
-
Date of next inspection
-
Feet
-
Rungs
-
Styles
-
Hinges
-
Section hooks
-
Screws/rivets/fixings
-
Overall condition
STEP LADDERS 1
- Step Ladder
-
Ladder ID name
-
Ladder Class En131 or Class 1 ONLY
-
Inspection tags displayed
-
Feet
-
Rungs
-
Hinges
-
Styles
-
Screws/rivets/fixings
-
Platform
-
Overall condition
HOP UPS
Hop Ups
-
Hop Up ID Name
-
Platform Condition
-
Legs
-
Feet
-
Leg Locking Mechanism
-
Inspection Tags In Date
DOCUMENTATION
-
Risk assessment available onsite
-
Fallstop safety documentation available onsite
CORRECTIVE ACTIONS CONTRACTOR
-
actions required
- Yes
- No
-
time frame
CORRECTIVE ACTIONS FALLSTOP
-
Follow up required
SIGN OFF
-
Contractor
-
Fallstop Ltd