Title Page

  • Prepared by:

  • Location:

  • Date:

  • Task/Activity:

  • Brief Description of Task/Activity

  • Document Number:

Fatal Risk Control

  • Make sure you know which Fatal Risks are present in your work area!

    Barrick Fatal Risk.jpeg.jpg
  • If any fatal risk controls are not effectively implemented or maintained the task/activity should be stopped immediately and the related risks needs to be re assessed by a competent person.

Lifting

  • These CRITICAL CONTROLS need to be in place when working with cranes and lifting equipment.

    BARRICK_FRI_POSTER_ENGLISH_SCREEN__LIFTING.png
  • Does the activity present lifting risks.

  • Lift Plan: Determine how the lift will be carried out with input from all persons involved

  • Equipment and Rigging: Ensure all lifting equipment is inspected, certified and load is secured and controlled

  • Calculate and Confirm: Analyse the weight of load and all associated equipment parameters

  • Drop Zone: Erect barricades and exclusion zone to restrict access to the area under a suspended load or within a drop zone

  • Communication: Positive communication from a single person to the operator

Sign off

  • Person Conducted Fatal Risk Critical Control Verification.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.