Information
-
FCRC Coastal Asset Management Inspection
Assessment
-
Asset No/Name
-
Address/Location
-
Date of Inspection
-
Inspection By
- FCRC - Darren Souter
- Contractor - Boating Facility Cleaning
- Contractor - Beach Cleaning
- FCRC - Other
- FCRC - Elizabeth Rosentreter
- FCRC - Building Services
- FCRC - Scott Anderson
-
Assessment Type
- Beach Access Paths
- Rock Revetment
- Concrete Revetment
- Boat Ramp
- Beach Access Stairs
- Boardwalks
- Beach Access Ramps
- Jetties and Pier
- Fish Cleaning Table
Condition (1 = Close or replace, 2 = Repairs Major, 3 = Repairs Minor, 4 = Monitor Condition, 5 = Good)
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Drop at access greater than 190mm?
-
Action must be taken to reinstate to acceptable standard at time of inspection. If this is not feasible the access must be closed and Coastal Officer / Engineering Services notified.
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
Condition (1 = Close or replace, 2 = Repairs Major, 3 = Repairs Minor, 4 = Monitor Condition, 5 = Good)
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
Condition (1 = Close or replace, 2 = Repairs Major, 3 = Repairs Minor, 4 = Monitor Condition, 5 = Good)
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
Condition (1 = Close or replace, 2 = Repairs Major, 3 = Repairs Minor, 4 = Monitor Condition, 5 = Good)
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Drop greater than a standard tread rise (e.g. 115mm-190mm)?
-
Details
-
Action must be taken to reinstate to acceptable standard at time of inspection. If this is not feasible the access must be closed and Coastal Officer / Engineering Services notified.
-
Rectification works undertaken at time of inspection?
Condition (1 = Close or replace, 2 = Repairs Major, 3 = Repairs Minor, 4 = Monitor Condition, 5 = Good)
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
Condition (1 = Close or replace, 2 = Repairs Major, 3 = Repairs Minor, 4 = Monitor Condition, 5 = Good)
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Any drop at access?
-
Details
-
Action must be taken to reinstate to acceptable standard at time of inspection. If this is not feasible the access must be closed and Coastal Officer / Engineering Services notified.
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
Condition (1 = Close or replace, 2 = Repairs Major, 3 = Repairs Minor, 4 = Monitor Condition, 5 = Good)
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
Boat Ramp Condition (1 = Close or replace, 2 = Repairs Major, 3 = Repairs Minor, 4 = Monitor Condition, 5 = Good)
-
Note: To be completed prior to any works being undertaken
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
Pontoon Condition (1 = Close or replace, 2 = Repairs Major, 3 = Repairs Minor, 4 = Monitor Condition, 5 = Good)
-
Is there a floating pontoon at this facility?
-
Note: To be completed prior to any works being undertaken
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
Cleaning Operation Details (cleaning contractor to complete)
-
Area temporarily closed and signage placed
-
Type and volume of waste
-
Waste removed
-
Lighting and Signage Cleaned (if applicable)
-
Local Low Tide Time and Height
-
Comments
Condition (1 = Close or replace, 2 = Repairs Major, 3 = Repairs Minor, 4 = Monitor Condition, 5 = Good)
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
-
Details
-
Rectification works undertaken at time of inspection?
Cleaning Operation Details (cleaning contractor to complete)
-
Area temporarily closed and signage placed
-
Type and volume of waste (over one month period)
-
Waste removed
-
Comments
Rectification (if not detailed above)
-
Problem
-
Proposed Rectification
-
Estimated Cost ($)
-
Comments
-
Adequate Signage
Photos
-
Photos
-
Add drawing