Title Page

  • Site visit conducted by:

  • Conducted on

  • Location

COMPANY / CLIENT / CONTACT FOR VISIT

  • Company name

  • Company address

  • Client contact

  • Client phone number

  • Client email

  • Alternative contact for visit if not above client

SITE CONTACT FOR BUILD / AFFILIATED SUPPLIERS

  • Site manager contact for build

  • Site ground worker contact

  • Site electrician contact

  • Site security contact

BUILDING INFORMATION GENERAL

  • Desired use / purpose of building

  • Define desired use

  • Hire or purchase

  • Hire option

  • Location for building on the site agreed

  • What is the process needed to confirm location for building?

  • Connected to other buildings or stand alone?

  • Groundworks required?

TIMESCALES

  • Lead time communicated - new building manufacture min. 8 weeks

  • Expected start date

  • Expected occupation date

DESIGN

  • Size, design / layout of structure agreed

  • Agreed / suggested size of structure (w x l x h)

  • CAD plans available of site and build area

  • Services required: (to be expanded on further below)

WALLS & GLASS

  • Type of walling req. (non-insulated single steel sheet / insulated PIR-S)

  • Thickness?

  • Colour of walls externally?

  • Colour of walls internally?

  • Height of walls

  • Any need to fix to wall? (extra framework / kitchenette wall / boiler / distro)

  • What for?

  • Glazing required?

  • Glazing requirement

  • Define requirement

  • Glazing location agreed?

  • Number of panels?

ROOF

  • Type of roof required (inflated PVC / single steel sheet / insulated PUR)

  • Thickness?

  • Profile of roof internally / externally?

  • Colour of roof externally?

  • Colour of roof internally?

  • Any requirement to hang / add load from roof space

  • What is to be hung?

  • What is the weight?

DOORS

  • Are doors requied?

  • Type of doors required on building

  • Roller shutter width + height?

  • Roller shutter width + height?

  • Roller shutter width + height?

  • Door location and number meets with evacuation legislation

  • Access steps and ramps considered with door locations

  • Type?

  • Define other

CDM

  • CDM site?

  • Fews responsibilities

SITE ACCESS & SECURITY

  • Site security in place

  • Site enclosed with secure perimeter fencing

  • Are Fews required to fence off work area?

  • Secure parking available for crew & supplier vehicles

  • How close is nearest parking?

  • How close is this to the work area?

  • Induction required by all site staff ahead of working on the site

  • Is there a booking in process / portal to be aware of?

  • What details are required to book in staff?

  • Permit to work to be issued by client

  • What permits are used on site? (i.e. general works, hot works, working at height...)

  • Daily registration of staff required

  • Where is this conducted?

  • Access restrictions - goods to site

SITE GENERAL

Build site condition & preparations

  • Existing ground surface of build site

  • Define other

  • Site clearance required (existing buildings/structures)

  • Site excavation works required to level area

  • Ground type following excavation

  • Define other

  • Ground type suitable for proposed building once excavated

  • Why not?

  • Further works required to facilitate building construction

  • Define requirement

  • Define other

  • 2m access path available for plant around entire footprint of structure

  • Trackway required

  • Define type of trackway required

  • Define other

  • Drainage groundworks required

Floor

  • Type of flooring required:

  • Define existing

  • Has water management been discussed (dwarf wall / sealant / screed / aco drain @ doorways & roller doors)

  • Define other

  • Have levels been taken?

  • What is maximum variance?

  • Have floor loadings been discussed? (i.e. limit of 350kg/m2)

  • Has water management been discussed (dwarf wall / sealant / screed / aco drain @ doorways & roller doors)

Compound conditions & preparations

  • Proximity & size of compound to allow for; welfare, plant, deliveries

  • Ground conditions suitable for plant access & HGV

  • Why not?

  • Compound ground surface

  • Define other

  • Compound ground conditions suitable

  • Trackway required?

  • What type of trackway is required?

  • Define other

  • Utility plans available?

  • Who is to conduct survey?

  • Define other contractor

Hazards

  • Overhead cables

  • Estimated height of cabling?

  • Adjoining buildings?

  • Underground services?

  • Plant restrictions on site?

  • Define other

  • Construction work by others planned on site during construction with potential interference?

  • Define planned works on site during construction

Anchoring

  • Method of securing structure to ground

  • Define other

Guttering & downpipes

  • Downpipe location agreed and connection to drainage to be made by client

  • Watertight connection to building by others

  • Has the client confirmed they will undertake connection?

WELFARE

Existing

  • Toilet facilities available for staff use on site (close proximity)

  • Canteen / kitchen facilities available for staff use on site (close proximity)

  • Storage facility available for materials / tools (lockable)

  • Water supply (drinking water) available on site

Temporary

  • Welfare cabin for site staff provided

  • Power supply for welfare cabin available (16 amp single ph.)

  • Grey waste drain available (disposal from welfare cabin)

HEATING, COOLING & VENTILLATION (HVAC)

  • Are Fews supplying HVAC?

  • What type of HVAC system is required?

  • Define other

  • Sufficient power (3ph) available for heating & cooling requirements

  • Heating & cooling notes

LIGHTING & ELECTRICAL

  • Are Fews supplying lighting and electrical install?

  • Internal lighting within roof space agreed (LED batten ceiling lighting)

  • LUX levels - any stipulation by client (specific to buildings function)

  • External lighting at door ways agreed

  • Fire exit lights above door ways agreed

  • Location and number of power sockets agreed

  • Understood that distro will be fixed to framework within electrical conduit

  • Location for distribution board agreed mounted to bespoke frame

  • Requirement for lockable distribution board cupboard

  • Access route for main incomer power supply agreed with client

  • Ext. socket / housing IP rating to be agreed (IP45 minimum requirement)

  • Power requirements understood from client relating to buildings function inc. any spare capacity needed for future modifications

  • Lighting & electrical notes:

CARPENTRY

  • Are Fews supplying any carpentry items?

  • Steps required from exit doorways, timber non slip decking finish & FR skirt

  • Ramp req. from exit doorways, timber non slip decking finish & FR skirt

  • Skirting required to perimeter in FR cement board with FR paint finish

  • Client specific paint colour

  • Define client specific paint colour

  • Carpentry notes:

FLOOR FINISHES

  • Are Fews providing floor coverings?

  • Commercial grade vinyl floor with hot welded seams - client to advise colour

  • Chosen colour?

  • Laminate flooring - client to advise colour

  • Chosen colour?

  • Suitability of floor to buildings use - light weight machinery to avoid tears

  • Connection of floor finish to existing building - who's responsibility

  • Floor finishes notes:

FIT OUT, FURNITURE & MISCELLANEOUS

  • Are Fews providing any fit out, furniture or miscellaneous items?

  • Kitchenette required?

  • Kitchenette required to include provision of

  • Define other

  • Provision of offices inc. suspended ceilings, glazed partitions & doorways required?

  • Provision of furniture inc. table, chairs, desks, benches, stools, poseurs etc required?

  • Provision of decorative feature within roof space (feature light, displays)

  • Provision of toilet facilities

H&S

  • Fire alarm system to be provided by:

  • Fire alarm system to be connected to sites existing supply by:

PLANNING PERMISSION

  • Planning permission to be sought by client

  • Planning permission to be approved / gained prior to building construction

  • Planning permission notes:

ADDITIONAL NOTES

  • Notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.