Title Page
-
Site visit conducted by:
-
Conducted on
-
Location
COMPANY / CLIENT / CONTACT FOR VISIT
-
Company name
-
Company address
-
Client contact
-
Client phone number
-
Client email
-
Alternative contact for visit if not above client
SITE CONTACT FOR BUILD / AFFILIATED SUPPLIERS
-
Site manager contact for build
-
Site ground worker contact
-
Site electrician contact
-
Site security contact
BUILDING INFORMATION GENERAL
-
Desired use / purpose of building
- Canteen
- Warehouse
- Office
- Manufacturing
- Sport
- Retail
- Film Studio
- Other
-
Define desired use
-
Hire or purchase
-
Hire option
-
Location for building on the site agreed
-
What is the process needed to confirm location for building?
-
Connected to other buildings or stand alone?
- Connected to other Fews temporary buildings
- Connected to existing building
- Stand alone
-
Groundworks required?
-
TIMESCALES
-
Lead time communicated - new building manufacture min. 8 weeks
-
Expected start date
-
Expected occupation date
DESIGN
-
Size, design / layout of structure agreed
-
Agreed / suggested size of structure (w x l x h)
-
CAD plans available of site and build area
-
Services required: (to be expanded on further below)
- Heating
- Cooling
- Lighting
- Power & distribution
- Steps
- Ramps
- Skirting
- Floor finishes (e.g. vinyl)
- Water boiler
- Kitchen
- Furniture
- Air to air exchanger
WALLS & GLASS
-
Type of walling req. (non-insulated single steel sheet / insulated PIR-S)
-
Thickness?
-
Colour of walls externally?
-
Colour of walls internally?
-
Height of walls
-
Any need to fix to wall? (extra framework / kitchenette wall / boiler / distro)
-
What for?
-
Glazing required?
-
Glazing requirement
-
Define requirement
-
Glazing location agreed?
-
Number of panels?
ROOF
-
Type of roof required (inflated PVC / single steel sheet / insulated PUR)
-
Thickness?
-
Profile of roof internally / externally?
-
Colour of roof externally?
-
Colour of roof internally?
-
Any requirement to hang / add load from roof space
-
What is to be hung?
-
What is the weight?
DOORS
-
Are doors requied?
-
Type of doors required on building
- Single pedestrian glazed
- Single pedestrian steel
- Double glazed
- Double steel
- Automatic sliding glazed
- Insulated roller shutter
- Non-insulated roller shutter
- Rapid roller shutter
- None
-
Roller shutter width + height?
-
Roller shutter width + height?
-
Roller shutter width + height?
-
Door location and number meets with evacuation legislation
-
Access steps and ramps considered with door locations
-
Type?
- Timber
- Chequer plate
- Other
-
Define other
CDM
-
CDM site?
-
Fews responsibilities
- Contractor
- Principal contractor
- Principal designer
SITE ACCESS & SECURITY
-
Site security in place
-
Site enclosed with secure perimeter fencing
-
Are Fews required to fence off work area?
-
Secure parking available for crew & supplier vehicles
-
How close is nearest parking?
-
How close is this to the work area?
-
Induction required by all site staff ahead of working on the site
-
Is there a booking in process / portal to be aware of?
-
What details are required to book in staff?
-
Permit to work to be issued by client
-
What permits are used on site? (i.e. general works, hot works, working at height...)
-
Daily registration of staff required
-
Where is this conducted?
-
Access restrictions - goods to site
SITE GENERAL
Build site condition & preparations
-
Existing ground surface of build site
- Grass
- Concrete
- Tarmac
- Earth
- Hardcore
- Other
-
Define other
-
Site clearance required (existing buildings/structures)
-
Site excavation works required to level area
-
Ground type following excavation
- Grass
- Concrete
- Tarmac
- Earth
- Hardcore
- Other
-
Define other
-
Ground type suitable for proposed building once excavated
-
Why not?
-
Further works required to facilitate building construction
-
Define requirement
- Concrete slab
- Concrete ringbeam
- Concrete footings
- Hardcore
- Dwarf wall
- Other
-
Define other
-
2m access path available for plant around entire footprint of structure
-
Trackway required
-
Define type of trackway required
- Aluminium panels (2.44m x 3.00m)
- LD20 (aluminium rolls)
- Rubber trackmats
- Fews stock trackmats
- Other
-
Define other
-
Drainage groundworks required
Floor
-
Type of flooring required:
-
Define existing
-
Has water management been discussed (dwarf wall / sealant / screed / aco drain @ doorways & roller doors)
-
Define other
-
Have levels been taken?
-
What is maximum variance?
-
Have floor loadings been discussed? (i.e. limit of 350kg/m2)
-
Has water management been discussed (dwarf wall / sealant / screed / aco drain @ doorways & roller doors)
Compound conditions & preparations
-
Proximity & size of compound to allow for; welfare, plant, deliveries
-
Ground conditions suitable for plant access & HGV
-
Why not?
-
Compound ground surface
- Grass
- Concrete
- Tarmac
- Earth
- Hardcore
- Other
-
Define other
-
Compound ground conditions suitable
-
Trackway required?
-
What type of trackway is required?
- Aluminium panels (2.44m x 3.00m)
- LD20 (aluminium rolls)
- Rubber trackmats
- Fews stock trackmats
- Other
-
Define other
-
Utility plans available?
-
Who is to conduct survey?
-
Define other contractor
Hazards
-
Overhead cables
-
Estimated height of cabling?
-
Adjoining buildings?
-
Underground services?
-
Plant restrictions on site?
- Crane
- Forks
- Telehandler
- Scissors
- Cherry picker
- Other
-
Define other
-
Construction work by others planned on site during construction with potential interference?
-
Define planned works on site during construction
Anchoring
-
Method of securing structure to ground
-
Define other
Guttering & downpipes
-
Downpipe location agreed and connection to drainage to be made by client
-
Watertight connection to building by others
-
Has the client confirmed they will undertake connection?
WELFARE
Existing
-
Toilet facilities available for staff use on site (close proximity)
-
Canteen / kitchen facilities available for staff use on site (close proximity)
-
Storage facility available for materials / tools (lockable)
-
Water supply (drinking water) available on site
Temporary
-
Welfare cabin for site staff provided
-
Power supply for welfare cabin available (16 amp single ph.)
-
Grey waste drain available (disposal from welfare cabin)
HEATING, COOLING & VENTILLATION (HVAC)
-
Are Fews supplying HVAC?
-
What type of HVAC system is required?
- Split system-ext. unit & floor standing internal air handlers
- Split system-ext. unit & overhead duct & vent (requires suspended ceiling)
- External chiller with floor standing internal air handlers
- External chiller with internal overhead duct & aerated tube
- Indirect blow heater with internal vent
- Air to air exchanger providing fresh air circulation in building
- Other
-
Define other
-
Sufficient power (3ph) available for heating & cooling requirements
-
Heating & cooling notes
LIGHTING & ELECTRICAL
-
Are Fews supplying lighting and electrical install?
-
Internal lighting within roof space agreed (LED batten ceiling lighting)
-
LUX levels - any stipulation by client (specific to buildings function)
-
External lighting at door ways agreed
-
Fire exit lights above door ways agreed
-
Location and number of power sockets agreed
-
Understood that distro will be fixed to framework within electrical conduit
-
Location for distribution board agreed mounted to bespoke frame
-
Requirement for lockable distribution board cupboard
-
Access route for main incomer power supply agreed with client
-
Ext. socket / housing IP rating to be agreed (IP45 minimum requirement)
-
Power requirements understood from client relating to buildings function inc. any spare capacity needed for future modifications
-
Lighting & electrical notes:
CARPENTRY
-
Are Fews supplying any carpentry items?
-
Steps required from exit doorways, timber non slip decking finish & FR skirt
-
Ramp req. from exit doorways, timber non slip decking finish & FR skirt
-
Skirting required to perimeter in FR cement board with FR paint finish
-
Client specific paint colour
-
Define client specific paint colour
-
Carpentry notes:
FLOOR FINISHES
-
Are Fews providing floor coverings?
-
Commercial grade vinyl floor with hot welded seams - client to advise colour
-
Chosen colour?
-
Laminate flooring - client to advise colour
-
Chosen colour?
-
Suitability of floor to buildings use - light weight machinery to avoid tears
-
Connection of floor finish to existing building - who's responsibility
-
Floor finishes notes:
FIT OUT, FURNITURE & MISCELLANEOUS
-
Are Fews providing any fit out, furniture or miscellaneous items?
-
Kitchenette required?
-
Kitchenette required to include provision of
- Sink
- Drawers
- Water boiler
- Cupboards
- Shelving
- Other
-
Define other
-
Provision of offices inc. suspended ceilings, glazed partitions & doorways required?
-
Provision of furniture inc. table, chairs, desks, benches, stools, poseurs etc required?
-
Provision of decorative feature within roof space (feature light, displays)
-
Provision of toilet facilities
H&S
-
Fire alarm system to be provided by:
-
Fire alarm system to be connected to sites existing supply by:
PLANNING PERMISSION
-
Planning permission to be sought by client
-
Planning permission to be approved / gained prior to building construction
-
Planning permission notes:
ADDITIONAL NOTES
-
Notes