Information
-
Contractor
-
Subcontractor (if applicable)
-
Site
-
Name of the contractor/subcontractor team leader on site
-
Conducted on
-
Prepared by
-
Location
-
Task being carried out
Please, describe the task being inspected
-
undefined
Checklist
GENERAL
-
NRSWA qualified person onsite?
-
Why Streek works card is not applicable in this case? (e.g. MDU internal installation)
-
ACTION:
Pause work until qualified operative is on site.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until full SWQR qualified operative can attend the worksite. -
Is the worksite set up compliant with the red book?
-
Why the Redbook is not applicable in this case? (e.g. MDU internal installation) Provided picture
-
ACTION:
Pause work until worksite is set according with Safety at Street Works ACoP (Redbook).
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required permit form the Local Authority, Traffic Management or other required equipment is in place to guarantee compliance. -
First Aid Kit available on site?
-
Minimum 1 First aid kit per team.
ACTION:
Communicate to the Contractor Project Manager/ H&S responsible person and follow up to ensure compliance with recommended fist aid at work means are in place. -
First Aider appointed person trained available on site?
-
Minimum 1 first aider appointed person per team. Communicate to the Contractor Project Manager/ H&S responsible person and follow up to ensure compliance with recommended fist aid at work means are in place.
-
Risk Assessments Method Statement available onsite and Dynamic Risk Assessment carried?
-
ACTION:
Pause works until the RAMS is briefed and Site Risk Assessment for the activity has been carried.
If not available, If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until suitable RAMS and Site Risk Assessment are available in the worksite. -
Are the operatives using the mandatory PPE?
-
ACTION:
Pause work until mandatory PPE is in use.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until full equipped operatives can attend the worksite.
WORK AT PIA UG
-
Qualification/ Accreditation Requirements
-
Operatives hold relevant BT/Openreach accreditations?<br><br>ALL Operatives shall hold accreditations (SA002 + S6 or S7) as per PIA Openreach CPs Accreditations Guidelines (Hold both N28 AND K8 as equivalents is accepted) , if there are new operatives, at least one member of the team shall hold the required accreditations and the new operative shall hold as a minimum the relevant Safety Awareness course (SA002).
-
ACTION:
Pause work until accredited operative is on site.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until full accredited operatives can attend the worksite. -
Are enough GDUs available, working, calibrated and placed at the bottom of the box?<br><br>Suitable GDUs must be in use for gas monitoring when working in PIA UG, one for each box open and placed at the bottom of the box.
-
ACTION:
Pause de works, If there are not enough GDUs available, then close the necessary boxes.
If still there are not enough GDUs to carry the activity, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until suitable GDUs are available in the worksite. -
Roll bars available for lifting chamber lids? <br><br>The use of roll bars is required working in the UG to prevent fire, explosions and MSDs.
-
ACTION:
Pause work suitable roll bar is available.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required equipment is in place to guarantee compliance. -
Fire Extinguisher available and secured in the cab?<br><br>Minimum 1 fire extinguisher ABC per team. <br><br>In general, ABC dry powder extinguishers are recommended as the best fire extinguishers for vans and other small commercial vehicles. A 2kg extinguisher of this type stored securely in the cab is sufficient for most commercial vehicles that are not carrying dangerous goods. <br><br>Fire extinguisher is required when working in the UG due the risk of fire.
-
ACTION:
Communicate to the Contractor Project Manager/ H&S responsible person to ensure compliance with recommended fire safety at work means are in place. -
Has the fire extinguisher been serviced in the last year? Please provide picture of the service tag. (If manufacture date is within a year time, please provide picture of the manufacture date)
WORK AT PIA OH
-
Qualification/ Accreditation Requirements
-
Do operatives have the appropriate BT Openreach competencies?<br><br>ALL Operatives shall hold accreditations (SA001 + S5, S8 or S9) as per PIA Openreach CPs Accreditations Guidelines (N27 as equivalent is accepted) , if there are new operatives, at least one member of the team shall hold the required accreditations and the new operative shall hold as a minimum the relevant Safety Awareness course (SA001).
-
ACTION:
Pause work until accredited operative is on site.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until full accredited operatives can attend the worksite. -
Openreach "Pre-Climb or Pre-Work Check"
-
Is last version of Openreach "Pre-Climb or Pre-Work Check" Guide available on site?
-
It is unlikely the operative memorize such document by heart, please check knowledge if he claims he does not need the guide.
ACTION:
Pause work suitable documentation is available.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until the document is available to guarantee compliance. -
Are pole probe test and 1lb hammer available for pole testing?
-
ACTION:
Pause work until suitable pole test tools are available.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required tools are place to guarantee compliance. -
Are telescopic rod or ultrasound available for cable height measure?
-
ACTION:
Pause work until suitable measurement tools are available.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required tools are place to guarantee compliance. -
Is the work being carried out using ladders?
-
Are ladders class 1 industrial or BS EN 131 compliant
-
Is there evidence of formal inspection? (At least every 6 months)
-
Ladders shall be adequate inspected every 3 months as per LA455-Safe-Use-of-Ladders-and-Stepladders-A-brief-guide, Communicate the situation to Contractor Project manager/ H&S responsible person an carry the required follow ups.
-
ACTION:
Pause work until inspected leaning ladder BS EN 131 compliant is in site.
If it is not possible, STOP WORK , communicate the situation to Area Delivery Manager , Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required equipment can be provided. -
Is the work being carried out using MEWPS?
-
Is the MEWP/ Cherry Picker LOLER certified?
-
ACTION:
Pause work until LOLER certified MEWP is in site.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required equipment and documentation can be provided. Works cannot restart until copy of LOLER certification has been provided. -
Is operator qualified (IPAF 1b)?
-
ACTION:
Pause work until accredited operatives are present at the worksite.
If it is not possible, STOP WORK. communicate the situation to Area Delivery Manger, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required IPAF 1b accredited operatives can attend the worksite. -
Is a rescue at height plan available on the site?
-
ACTION:
Pause work until rescue plan is available.
If it is not possible, STOP WORK. communicate the situation to Area Delivery Manger, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required rescue plan is acknowledge by the operatives in the worksite.
WORK AT SDU/MDUs
-
Qualification/ Accreditation Requirements
-
Do operatives have the appropriate BT Openreach competencies?<br><br>ALL Operatives shall hold accreditations (SA020 + S7 or S8) as per PIA Openreach CPs Accreditations Guidelines, if there are new operatives, at least one member of the team shall hold the required accreditations and the new operative shall hold as a minimum the relevant Safety Awareness course (SA020).
-
ACTION:
Pause work until accredited operative is on site.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until full accredited operatives can attend the worksite. -
Openreach "Pre-Climb or Pre-Work Check"
-
Is the property Asbestos register available on site?
-
In MDUs, is a legal responsibility of the property mangement to provided Asbestos register
ACTION:
Pause work suitable documentation is available.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until the document is available to guarantee compliance. -
Provide evidence that he building is not considered a MDU
-
Is the property evacuation plan available on site?
-
In MDUs, is a legal responsibility of the property mangement to provided the Evacuation Plan. Normally a evacuation layout can be found at the hall/reception.
ACTION:
Pause work suitable documentation is available.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until the document is available to guarantee compliance. -
Is fire sealing available?
-
ACTION:
Pause work until suitable fire sealing is available.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required tools are place to guarantee compliance. -
Are telescopic rod or ultrasound available for cable height measure? <br><br>N/A if not installing dropwires
-
ACTION:
Pause work until suitable measurement tools are available.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required tools are place to guarantee compliance. -
Is the work being carried out using ladders?
-
Are ladders class 1 industrial or BS EN 131 compliant
-
Is there evidence of formal inspection? (At least every 6 months)
-
Ladders shall be adequate inspected every 3 months as per LA455-Safe-Use-of-Ladders-and-Stepladders-A-brief-guide, Communicate the situation to Contractor Project manager/ H&S responsible person an carry the required follow ups.
-
ACTION:
Pause work until inspected leaning ladder BS EN 131 compliant is in site.
If it is not possible, STOP WORK , communicate the situation to Area Delivery Manager , Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required equipment can be provided. -
Is the work being carried out using MEWPS?
-
Is the MEWP/ Cherry Picker LOLER certified?
-
ACTION:
Pause work until LOLER certified MEWP is in site.
If not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required equipment and documentation can be provided. Works cannot restart until copy of LOLER certification has been provided. -
Is operator qualified (IPAF 1b)?
-
ACTION:
Pause work until accredited operatives are present at the worksite.
If it is not possible, STOP WORK. communicate the situation to Area Delivery Manger, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required IPAF 1b accredited operatives can attend the worksite. -
Is a rescue at height plan available on the site?
-
ACTION:
Pause work until rescue plan is available.
If it is not possible, STOP WORK. communicate the situation to Area Delivery Manger, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required rescue plan is acknowledge by the operatives in the worksite.
CIVILS (blockage/ duct laying)
-
Qualification/ Accreditation requirements for civils
-
SWQR qualified person has additional units for excavation and reinstatement?
-
Pause work until qualified operative is on site.
If not possible, STOP WORK and communicate the situation to F&W Civils Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until full SWQR qualified operative can attend the worksite. -
Operatives hold relevant BT/Openreach accreditations?<br><br>ALL Operatives shall hold accreditations (SA006 + K8 + DB1, CD1 or BBM1 depending of activities undertaken) as per PIA Openreach CPs Accreditations Guidelines , if there are new operatives, at least one member of the team shall hold the required accreditations and the new operative shall hold as a minimum the relevant Safety Awareness course (SA006).
-
ACTION:
Pause work until accredited operative is on site.
If not possible, STOP WORK and communicate the situation to F&W Civils Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until full accredited operatives can attend the worksite. -
Is an A55 in place?
-
ACTION:
Pause work until civils team can provide the A55.
If not possible, STOP WORK and communicate the situation to F&W Civils Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required documentation can be provided. -
Is permit required with the Local Authority? (Carriage incursion, partial carriage incursion, pathway closing...)
-
What permit is required? The right permit number shall be placed in the information board
-
Does the contractor hold the right permit from the Local authority and it is shows in the information board?
-
ACTION:
Pause work until civils team can provide the permit number.
If it is not possible, STOP WORK and communicate the situation to Area Delivery Manager, Project Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required documentation can be provided. -
Are utility plans available on site?
-
ACTION:
Pause work until civils team can provide the utility prints.
If the dig was already executed by the time of inspection. STOP WORK, and require a temporary restainment of the hole/trench, communicate to F&W Civils Manager.
If Utility Prints are not available, STOP WORK and communicate the situation to Area Delivery Manager, F&W Civils Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required documentation can be provided. required documentation can be provided. -
Is a Cable Avoidance Tool and Signal Generator (CAT 4+ and Genny) on site and calibrated?<br><br>Emphasis in CAT 4+ (CAT 4 does not included feature for depth estimation to help gauge the depth of buried utilities as well as identifying them quickly)
-
ACTION:
Pause work until until calibrated CAT4+ & Genny are in site.
If the dig was already executed by the time of the inspection, pause work and require a scanner of the surrounding areas of the worksite, hole/trench, communicate to F&W Civils Manager.
If CAT4+ & Genny are not available, STOP WORK and communicate the situation to Area Delivery Manager, F&W Civils Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required equipment can be provided.
Stop work until calibrated CAT & Genny are in site. If it is not possible, Communicate the situation to Civils Manager and Contractor Project Manager/ H&S responsible person in order to reschedule the activity until required equipment can be provided.