Title Page
-
Conducted on
-
Prepared by
-
Location
-
Project Name
-
Project Number
-
Operative
-
Do components sizes conform as detailed ondrawing/parts list/allocation?
-
Check for corrosion or damage
-
If Headbox is paintwork, RAL colour correct (if applicable)
-
If painted, is paintwork free from scratches,dents/runs
-
Position of brackets and materials correct to drawing/allocations
-
Check all fixing bolts, screws, nylon nuts, brackets, end plates, and all small parts are secure
-
Box section is labelled/identified
-
Side guide visual check
-
Smoke seal visual check
Pass/fail
-
passed
-
Rejection comments and applicable actions
-
Additional comments
-
Add signature