Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Fulham wharf handover QA block
- block A
- block B
- block C
- block B tower
-
Level 4
-
Plot number 95
-
Select date
-
Inspection / QA
-
Are all window and doors working
-
Are all beads installed
-
Is all gasket installed correctly
-
Glass free from scratches
-
Frames free from scratches
-
All handles installed correctly
-
Are all keys together for plot and locks are working
-
Is mastic complete
-
Are weep caps installed
-
All external flashings installed
-
All protection cleaned
-
Keys handed over to Barratts
By signing this handover you accept that any damage caused after this date Barratts are reliable for. Any works needed after will require an instruction.
-
M-price manger / supervisor
-
Barratts manager
-
Comments from Barratts