Periodic Dry Riser Inspection Report

  • Is there adequate signage present

  • Is the riser inlet box free from defects

  • Are the keys for door locks available

  • Are all door locks operational

  • Are the riser outlet boxes free from defects

  • Is all pipe work secured adequately and free from corrosion

  • Is drain valve undamaged and operational

  • Are inlet valves undamaged and operational

  • Are inlet flange bolts secure

  • Are all outlet landing valves undamaged and operational

  • Are all hand wheel locknuts and retaining nuts secure

  • Are all landing valve flange bolts secure

  • Are all instantaneous seals in a serviceable condition

  • Are all pipe work joints and seals free from leaks

  • Have all moving parts been lubricated

  • Is system fully operational in accordance with BS 9990

  • Any further comments on system

  • Engineer signature

  • Customer signature

Office Use Only

  • Operation check

  • Admin stage 1

  • Admin stage 2

  • Admin stage 3

  • Closed & filed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.