Periodic Dry Riser Inspection Report
-
Is there adequate signage present
-
Is the riser inlet box free from defects
-
Are the keys for door locks available
-
Are all door locks operational
-
Are the riser outlet boxes free from defects
-
Is all pipe work secured adequately and free from corrosion
-
Is drain valve undamaged and operational
-
Are inlet valves undamaged and operational
-
Are inlet flange bolts secure
-
Are all outlet landing valves undamaged and operational
-
Are all hand wheel locknuts and retaining nuts secure
-
Are all landing valve flange bolts secure
-
Are all instantaneous seals in a serviceable condition
-
Are all pipe work joints and seals free from leaks
-
Have all moving parts been lubricated
-
Is system fully operational in accordance with BS 9990
-
Any further comments on system
-