Information
-
Fire Cert Inspection -
-
Conducted on
-
Prepared by
-
Location
-
Personnel Involved
AIR CONDITIONING SYSTEM - CED FC ACS
-
Name of Building:
1a. AHU
-
Smoke cut-off system provided within return air stream of AHU
-
Activation of smoke-cut-off system shuts down AHU
-
Manual reset provision for AHU
-
No storage in AHU room
-
Smoke detector provided and tested in order
1b. FIRE DAMPERS
-
Fire Dampers are properly installed
-
Motorised Fire dampers operate upon activation of auto fire alarm detectors
-
No obstruction to dampers louver (blades) movement
-
Access door for inspection of Fire dampers provided
-
Fire dampers of approved rating and with PSB label
Inspection details
-
Select date
-
Facilities Management Rep
-
WSH Personnel
ATRIUM SMOKE CONTROL SYSTEM - CED FC ASCS
-
Name of Building:
-
Smoke detectors provided at the perimeter of the Atrium
-
Separate manual reset switch provided
-
Functions under Secondary supply provided
-
Auto supply mode activated by fire alarm system (where applicable) under Secondary power supply
-
Manual activation provision installed
-
System extraction air fan operate upon activation of fire alarm
-
Smoke curtains operate upon activation of fire alarm
-
Ventilation louvers operation by fire alarm and under secondary power supply are in order
-
All fire scenarios where is / are designed under the engineered smoke control system has / have been tested
-
Air-condition cut-off upon activation of fire alarm
Inspection Details
-
Select date
-
Facilities Management Rep
-
WSH Personnel
AUTOMATIC FIRE ALARM SYSTEM - CED FC AFAS
-
Name of building:
-
Name of monitoring company:
-
Building code no:
Heat/ Smoke Detector Test
-
Sufficient coverage
-
Detector points not painted
-
Detector points unobstructed
-
System connected to monitoring company / 995
-
Alarm signal transmission received by monitoring company
-
Zone tested is indicated correctly on main-alarm panel
-
Audible fault alarm & fault indication light provide at main-alarm panel
-
Zoning diagram provided next to the main-alarm panel
-
Zone tested is indicated correctly on sub-alarm panel
-
Audible fault alarm & fault indication light provide at sub-alarm panel
-
Zoning diagram / mimic panel provided next to the sub-alarm panel
-
Alarm bells in operational condition
-
Alarm general sounding throughout the building
Inspection Details
-
Select date
-
Facilities Management Rep
-
WSH Personnel
AUTOMATIC FIRE SUPPRESSION SYSTEM FOR COOKING HOOD - CED FC AFSS
-
Name of building:
1. General
2. Cylinder for Extinguishing Agent
3. Nozzle and Pipe Works
4. Heat Activating Device
DRY RISER SYSTEM - CED FC DRS
-
Name of building:
-
Dry Riser Type?
1. Breeching Inlet
-
Inlet housed in glass fronted protective enclosure
-
Properly installed / secured
-
Clear of Obstruction
-
About 0.76m above finished floor level
-
Labelled “DRY RISER INLET” and differentiated
-
Inlet painted in yellow colour
2. Riser
-
Not passing through unprotected area / Fire rated
-
Air release valve provided
-
Earthing provided
3. Landing Valve
-
0.76m to 1m above finished floor level
-
Condition of hand wheel satisfactory
-
Blank Cap provided
-
Strapped and padlocked in closed position
-
Labelled / Numbered
-
Clear of Obstruction
-
Landing valve painted in yellow colour
4. Testing of Hydrostatic Pressure
-
Pressure constant at 200 PSI for 2 hrs
-
Air release valve functioning
Inspection Details
-
Select date
-
Facilities Management Rep
-
WSH Personnel
ENGINEERED SMOKE CONTROL SYSTEM - CED FC ESCS
-
Name of building:
-
Separate manual reset switch provided
-
Functions under secondary supply provided
-
Auto supply mode activated by fire alarm system under normal power supply
-
Auto supply mode activated by fire alarm system under secondary power supply
-
Manual activation provision installed
-
Air exhaust fan operate upon operation of fire alarm
-
Air condition system cut-off upon activation of system
-
Smoke curtain operate upon activation of system
Inspection Details
-
Select date
-
Facilities Management Rep
-
WSH Personnel
HOSE REEL SYSTEM (WITH PUMP) - CED FC HRS
-
Name of building:
1. Hose
2. Testing
-
No Leakage detected
-
6m throw achievable or flow rate of 0.4 litre / sec
3. Pump
-
Pump can be manually tested
-
Auto changeover from normal to secondary power supply
-
Auto changeover from duty to standby pump operation in order
-
Differentiated
Inspection Details
-
Select date
-
Facilities Management Rep
-
WSH Personnel
LIFT - CED FC LIFT
-
Name of building:
-
No of Passenger Lift:
-
No of Cargo Lift:
-
No of Fire Lift:
1. Passenger and Fire Lift
-
Lift homing under fire alarm activation in order (Clause 13.1.3)
-
Lift homing under secondary power supply (Clause 13.1.2)
-
Warning notice for fire situation provided (Clause 13.1.8)
-
PSB (SISIR) approved EBOPS provided (Clause 12.3)
-
EBOPS supply to lift car bell, lighting and fan in order
-
Lift differentiated with numbers
-
Storey Numbering for lift lobbies provided
-
Lifts home at designated floor
2. Fire Lift (Size and Capacity)
-
State capacity:
-
Lift travel from ground to top level within 1 minute
-
Fire lift operated under fire switch in order
-
Labelled “FIRE LIFT”
-
Fire switch properly enclosed in labelled glass fronted cover
-
No combustible furnishing
Inspection Details
-
Select date
-
Facilities Management Rep
-
WSH Personnel
OTHER SYSTEMS AND FIXTURES - CED FC OSF
1a. Hosereels (w/o Pump)
-
Is the nozzle condition satisfactory?
-
Non kinking reinforced rubber?
-
Length of hose 30m?
-
No locking device provided?
-
Condition of stop cock satisfactory?
-
Clear of obstruction?
-
Labelling provided for cabinet?
-
Labelling provided for instructional signage?
1b. Hosreel (w/o Pump) - Testing
-
No leakage detected?
-
6m throw achievable with 0.4L/sec?
2. Portable Fire Extinguisher
-
Properly hung on bracket
-
Clear of obstruction
-
Service by licensed contractor
-
PSB label
-
Date of service
3. Manual Call System (Call Point)
-
The colour for all fire alarm panels, bell ,conduit <br>and trunking are painted red<br>
-
Clear of obstruction
-
Fire alarm zoning diagrams provided near fire <br>alarm panel<br>
-
General sounding throughout the building
-
Located about 1.4m from floor level
-
Alarm bell in operational condition
-
The fire alarm sounding distinguishable from any other alarm system
-
Audible fault alarm & fault indication light <br>provided at sub / main panel<br>
-
Zone tested is indicated correctly on the fire<br>alarm main / sub panel<br>
-
“IN CASE OF FIRE CALL 995” signage provided
4a. Exit signs
-
Exit signs adequately provided along: 1. Staircase, 2. Escape Routes, 3. Public Area
-
Exit sign visible?
-
Directional Exit Sign connected to secondary power supply tested in order?
-
Exit sign complied with CP19 colour code (green and white combination)
4b. Emergency Lighting
-
Emergency lighting adequately provided along: 1. Staircase, 2. Escape Routes, 3. Public Area, 4. Essential Plant Rooms
-
Automatic operation tested in order?
-
Emergency lighting provided is sufficient?
-
Identification (CI 7.8 CP 19)
-
Emergency lighting connected to secondary power supply?
5a. Fire Doors
-
Fire door installed at the following location are in order: 1. Staircases, 2. Escape Routes, 3. Public Area
-
Fire doors provided with PSB label?
-
Swing of door in direction of escape?
-
No stopper detected?
-
Is the fire rated door fitted with door closer?
-
Is the fire rated exit door in closed fitting?
-
Clear from obstruction?
-
Panel above the door same rating as the wall?
-
No locking device for doors passing to the firefighting staircase?
-
Viewing glass panel at fire rated door does not exceed 650mm2
5b. Exit Doors
-
Doors unlocked during operating hours?
-
Clear of obstruction?
6. Duct Riser
-
Fire stopped accordingly
-
Protected by fire-resisting enclosure
-
No Storage
7. Staircases
-
Open type -
-
Enclosed type -
-
Clear from any obstruction and combustible material?
-
No combustible furnishing?
-
Fully compartmented?
-
Service pipe (gas, oil and vent) other that water pipes passing through protected staircase, lobby area
8. External Fire Fighting Access Opening
-
Clear of obstruction internal and external?
-
(Red or Orange) external marking provided?
-
Signage "Fire Fighting Access - Do Not Obstruct" provided?
-
Readily open from inside and outside?
Inspection Details
-
Select date
-
Facilities Management Rep
-
WSH Personnel
PRESSURISATION SYSTEM - CED FC PS
-
Name of building:
-
Location of fans:
-
Separate manual reset switch provided
-
Fan operation at high speed under fire alarm (if single)
-
Both fans operating under fire alarm (if double)
-
Fan operating upon secondary power supply (Fire mode)
-
Fan in operation can only be stopped manually
-
Average air velocity not less than 1 m/s
-
Force require to open any door is not more than 110 N
-
Independent system for smoke lobby / protected corridor connected to secondary power supply
Inspection Details
-
Select date
-
Facilities Management Rep
-
WSH Personnel
PRIVATE HYDRANT SYSTEM - CED FC PHS
-
Name of building:
-
Hydrant No:
1. Hydrant
-
Rigidly mounted on ground
-
Cover for spindle chamber visible
-
Spindle depth not more than 1 metre
-
Blank cap provided
-
Spindle chamber and Hydrant clear of obstruction
-
Hydrant painted with yellow colour band
Testing of Static Pressure and Flow Rate
-
Hydrant Details
-
Hydrant No:
-
Static Pressure:
-
Flowrate in L/sec
-
Remarks:
Inspection Details
-
Select date
-
Facilities Management Rep
-
WSH Personnel
STANDBY GENERATOR SET - CED FC SGS
-
Name of building:
-
Location of Standby Gen Set:
1. Generator Operation
-
Automatically changeover within 15 sec.
-
Smoke exhaust in-order
-
No storage
2. Generator Set tested on full load - Supply to the following systems simultaneously
a) Emergency Lighting
b) Fire Pump System
c) Lift System
d) Mechanical Vent System
e) Public Addressing System
Inspection Details
-
Select date
-
Facilities Management Rep
-
WSH Personnel
VOICE COMMUNICATION SYSTEM - CED FC VCS
-
Name of Building:
One Way Communication
-
Operational test in order
-
Standby battery provided
-
Secondary power supply provided
-
Over riding switch provided at Fire Command Center (FCC)
Two Way Communication
-
Operation tested in order
-
Standby battery provided
-
Secondary power supply provided
-
Provided at Strategic Location
-
To label & colour in red
-
1.5m above the floor
-
Operational test is indicated correctly at panel in FCC
Inspection Details
-
Select date
-
Facilities Management Rep
-
WSH Personnel