Title Page
-
Note:
"Inspection Score" refers to completion of the service report, not the condition of the site.
Further Works needed are in the "Remedial Works Required" section of the report. -
Document No.
-
Client
-
Site
-
Location
-
On-site customer representative
-
Conducted on
-
Prepared by
-
Engineer Signature
-
Customer representative signature
-
Were you satisfied with your service today?
Premises Checklist
-
Are RAMS in place for the work to be carried out?
-
Are Floor Plans available?
-
Is the required Fire resistance known?
-
Where has this information been provided from?
-
All remedial action advised will be to a minimum of 60 minute Fire Rating unless otherwise.
-
Is a quote required?
-
Summary of remedial works required
Fire Door Sets
-
Fire Doors
-
Door Set Location:
-
Is the door leaf free from damage?
-
Is there a consistent gap under the door?
-
Is there evidence to confirm the glass is fire rated?
-
No alterations have been made to the door set that would affect its Fire Rating?
-
Is the frame to the door leaf gap consistently 3mm?
-
Are intumescent seals in place?
-
Are the seals well attached inside the groove and free from damage?
-
Has the door been fitted with appropriate signage?
-
Does the door-closer close the door and engage any latch?
-
Is the door-closer free from damage and not leaking?
-
Are the hinges free from metal fragments and ore leakage?
-
Are all the screws the correct size?
-
Is there a minimum of three hinges with all the screws fitted?
-
Remedial Works Required:
-
Comments:
-
Post-remedial works photo: