Pre line Audit

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Untitled Page

  • Are windows installed and sealed?

  • Are front doors installed?

  • Do front doors require fire sealant?

  • Has fire sealant been installed correctly? (10mm max thickness)

  • Are margins around front doors acceptable?

  • Are all fire collars complete?

  • Have fire penetrations been tagged and recorded?

  • Has cavity inspection been completed and passed?

  • Has pre-line plumbing inspection been completed and passed?

  • Has framing inspection been completed and passed?

  • Is framing in correct location?

  • Is timber framing straight and plumb? (mark with dazzle areas that need planning or packing)

  • Is timber framing dry? (check bottom plates in bathroom areas)

  • Is timber nogging in correct location for range hood?

  • Is timber nogging in correct location for heat pump?

  • Is timber nogging in correct location for vanity?

  • Is timber nogging in correct location for towel rails? (for KO job 800mm and 1600mm)

  • Is timber nogging in correct location for toilet roll holder?

  • Is timber nogging in correct location for shower liner?

  • Is timber nogging in correct location for hot water cylinder strapping?

  • Is the vanity mirror rebated?

  • Has vanity mirror framed out at correct size?

  • Has ceiling hatch been framed out?

  • Is rondo installed?

  • Is rondo installed to correct heights?

  • Are ceiling diaphragms required / installed?

  • Are there any rondo seismic requirements?

  • Are plumbing locations correct? (check all wing backs in kitchen and bathroom)

  • Are all light switches in the correct location?

  • Do all flush boxes comply with Gib bracing?

  • Are all power points in correct locations? (check location of oven, fridge, range hood)

  • Are power points in wet area at correct distances from water supplies?

  • Are ceiling lights and cables in correct positions?

  • Is this a KO project?

  • Are power points at correct heights off the ground (500mm) and correct distances from internal corners (500mm)

  • 3 power points to bedrooms?

  • 3 power points in the kitchen?

  • 1 socket in the hallway?

  • Bedroom heater power in correct location?

  • Has the correct insulation been installed and to a high standard? (no gaps around insulation, clean, and dry)

  • Have interior doors been installed?

  • Are doors fixed off correctly?

  • Are door margins acceptable?

  • Has Gib been measured?

  • Has Gib been delivered?

  • Are units clean and swept out ready for Gib fixers?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.