Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Drywaller
-
Confirmed pre-lined inspection is okay
-
Board is fixed clear of floor
-
Ceiling butt joins propped / blocked & wadded
-
External corners straight & true
-
End of walls square
-
All cut outs clear of plaster
-
All cove joints tidy / straight lines
-
All plaster correctly sanded
-
Floors scraped clean
-
Checked joins with halogen light
-
Plaster recesses checked for square & tidy
-
Check orders / plans for non - standard items
-
Insulation in required walls
-
Soundproofing in all required walls
-
Bath hob lined with Villaboard
-
Check Bath for Damage
-
Wiring brought through
House Keeping
-
Bin in place
-
Site left in a safe manner
-
G.J sign and danger sign up
-
Job left clean, rubbish in bin.
Are any rectification works required?
-
Works required
-
Date to be completed
-
Signature of person conducting the Audit