Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Expires on:
-
Prepared by
-
Location
-
Personnel
PRESCRIPTION PARTICULARS
-
Client
-
Location
-
Map location ( if available)
-
Site Plan
-
Proposed Date and Start Time of stop work
-
Proposed Date and Finish Time of stop work
-
Typical Fuel Load on Site
WEATHER CONDITIONS REQUIRED
-
Maximum Fire Danger Reading (FDR)
- Low Moderate
- High
- Very High
- Severe
- Extreme
- Catastrophic
-
Grain Harvesting Operations Table (GHOT) rating ( if wind speed is greater than GHOT rating, operations must stop)
- 19
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
-
Wind Speed (at time of report )
- 19
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
-
Weather Forecast
NOTIFICATIONS
-
Dean Coughlan - 0412 313 095
-
Chris McDonald - 0408 831 605
-
Dwayne Noack - 0449 608 010
-
Client Representative (insert name, number & company)
-
Local Fire Authority ( insert location & number)
-
Other ( insert name & number)
Client correspondence:
TRAFFIC MANAGEMENT PLAN
-
Traffic Management Plan Required
-
Traffic Management Plan Details
-
Traffic Sign Locations
EXPOSURES AND RISKS
-
Life
-
Properties
-
Environment
GRAIN HARVESTING OPERATIONS TABLE
AUTHORISATION AND SIGN OFF
-
Prepared By Sign
-
Approved By Sign
-
Client sign