Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
undefined
-
Test & Inspection carried out in accordance with BS5839-1:2017
Audit
1.0 Panel
-
1.1 Panel Type
-
1.2 Panel Manufacturer
-
1.3 Loops/ Zones Fitted
-
1.4 Additional Panels Fitted
-
1.5 Repeater Panel Fitted
-
1.6 Protocol
-
1.7 Battery Size
-
1.8 Battery Quantity
-
1.9 Panel Control
-
1.10 Panel Monitored
-
1.11 Ancillary Equipment Connected
2.0 Control Equipment
-
2.1 Mains Supply to Panel Labelled
-
2.2 Double Pole Isolation
-
2.3 Separate Cable Entry For Mains Supply
-
2.4 Maintenance Contract Details Displayed On Panel
-
2.5 Is Panel Correctly Sited
-
2.6 Zone Chart Displayed Adjacent To Panel
3.0 Alarm Panel Function
-
3.1 Display Indicators Tested
-
3.2 Charge Voltage Correct
-
3.3 Battery Fault Indicator Working
-
3.4 Mains Fault Indicator Working
-
3.5 Alarm Load On Batteries Checked
-
3.6 Printer Functions Tested
4.0 Batteries
-
4.1 Are Batteries Over 5 Years Old
-
4.2 Battery Date
-
4.3 Date Marked On Batteries
-
4.4 Are Batteries Correct Size
-
4.5 Are Leads And Connections Good
-
4.6 Battery Calculations Checked
5.0 Detection
-
5.1 Are Detectors Correctly Sited
-
5.2 Are Detectors In Good Condition
-
5.3 Are Detectors Beyond Service Life (10 Years)
-
5.4 Are Detectors Correct Type For Environment
-
5.5 Do Detectors Have 500mm Clearance
-
5.6 Are Detectors 1000mm From A/C/Vent Units
-
5.7 Are MCP's Correctly Sited
-
5.8 Are MCP's On All Exits & Change Of Level
-
5.9 Are All MCP's Fitted With Hinged Covers
6.0 Sounders
-
6.1 Are Sounders All The Same Type
-
6.2 Are There 2 Or More Sounder Circuits
-
6.3 Are Sound Levels Correct
-
6.4 Are Beacons Correctly Sited
7.0 Ancillary Equipment
-
7.1 Door Retainers/ Closures Operational
-
7.2 Plant Shutdown
-
7.3 Gas Shutdown
-
7.4 Lift Shutdown
-
7.5 AOV/ Smoke Vents
-
7.6 Other Equipment (Please State)
8.0 Visual Inspection
-
8.1 Any Change In Layout
-
8.2 Any Additional Partitions Built
-
8.3 Change Of Use To Building
-
8.5 Are All Cables Correct Type
-
8.6 Are Cable Fixings Non-Combustable
-
8.7 Is Clearance Above Storage Greater Than 300mm
9.0 ARC
-
9.1 ARC Notified
-
9.2 ARC Tested
-
9.3 ARC Re-Instated
10.0 Certification
-
10.1 Log Book Checked & Updated
-
10.2 Paperwork Filled In & Signed
11.0 Variations/ Comments/ Actions
-
undefined
Signed
-
Engineers Signature
-
Clients Signature
Site Equipment
Additional Systems Serviced
-
Emergency Lighting
-
Fire Extinguishers
-
Sprinkler System
-
Suppression System
-
Fire Doors
-
Nurse Call / Refuge System
-
24 Hour Monitoring
Appendix
-
Add media