Title Page
-
Reserve Name
-
Date and time
-
Prepared by (initials)
-
Polygon ID
-
FMZ Type
-
Are the dimensions of the polygon on ground as per the map?
-
If NO, what works are required to align area to mapped polygon?
-
Is the Polygon within specification?
-
If FMZ not within specification, outline works required
- undertake lateral seperation
- undertake vertical seperation
- undertake canopy seperation
- ensure FMZ is at specified width
- uindertake selective slashing
-
Equipment required
- truck and chipper
- 4x4 ute
- chainsaw
- brush cutter
- quickspray
- knapsack
- tractor
- outfront
-
Works methods required
- cut, paint, remove
- frill and fill
- brushcut
- Chainsaw
- hand tools
- cut and stack
- foresrty mulching
- knapsack spray
- quick spray
- tractor slasher
- outfront
-
Are the required works Creation or Maintenence?
-
Other works methods
- spraying
- one off slash
- forestry mulcher
-
Number of personnel required
-
Hours to complete
-
Will these works cause a visual impact in the local area?
-
If YES, what level of community consultation is required?
- Signs
- Signs and Mail Out
-
Further Comments
-
Inspection Complete?