Stage One, Structural Opening
-
Is the opening to agreed sizes as shown on the approved construction issue drawings
Stage Two, Installation - Sub Structure
-
Has the Metsec backing structure been installed in the correct position
-
Has the breather membrane been installed the the rear face of the Metsec and all overlaps and joints sealed as per the manufacturers spec
-
Has the CP board been installed according the construction issue drawings
Stage Three, Tyvek - Top Hat - Brackets
-
Has the Tyvek membrane been installed to the full cladding area, all laps facing the correct direction and all joints and ends sealed as per the manufactures specification.
-
Has top hat and helping hand brackets been fixed in the correct position with the correct fixing type as per the construction issue drawings
Stage Four, Insulation - Tape - Rails
-
Has the correct insulation been installed at the correct thickness according to construction issue drawings.
-
Has all the joints been taped over<br>Has all the brackets protruding through the insulation been fully taped.
-
Has the rails been installed in the correct position.
Stage Five, Cladding Panel and Coping
-
Has the cladding panels been installed at the correct position and free from defects or scratches
-
Has the coping panels been installed free from defects and scratches.
Stage Five, Handover
-
Is the cladding wall in an acceptable condition to be handed over
-
Add media
-
Add media
-
Signed for on behalf of Fleetwood Architectural
-
Signed on behalf of Lend Lease
-
Select date