Title Page
-
Site conducted
-
Department
-
Conducted on
-
Prepared by
-
NAME OF OPERATOR
-
NAME OF EVALUATOR
-
DATE
-
TYPE OF FLT AND FLEET NUMBER
PRE OPERATION OF THE FLT
-
WAS A PRE USE INSPECTION CARRIED OUT
-
WAS A VISUAL INSPECTION OF THE WORK AREA CARRIED OUT
-
WAS A VISUAL INSPECTION OF THE LOAD CARRIED OUT
-
WERE THE FORKS ADJUSTED FOR THE LOAD
-
WAS THE WEIGHT OF THE LOAD PRE- DETERMINED BEFORE OPERATIONS COMMENCED
-
WAS THE FLOOR OF THE TRAILER/ VEHICLE INSPECTED BEFORE OPERATIONS COMMENCED
-
WERE THE TRAILER/ VEHICLE BRAKES AFFIXED AND VEHICLE ENGINE SWITCHED OFF
-
ARE THE VEHICLE KEYS REMOVED FROM THE VEHICLE BEING LOADED
-
DID THE OPERATOR USE THE SEAT BELT
OPERATION OF THE FLT
-
DID THE OPERATOR SHOW FAMILARITY WITH THE CONTROLS
-
WAS THE LOAD APPROACHED AT A SAFE SPEED
-
DID THE OPERATOR POSITION THE FORKS AND FLT CORRECTLY WITHOUT HITTING ANYTHING
-
WERE THE FORKS POSITIONED UNDER THE LOAD CORRECTLY
-
WAS THE LOAD CORRECTLY BALANCED
-
DID THE OPERATOR RAISE AND TILT THE LOAD PROPERLY
-
WAS THE LOAD RAISED OR LOWERED TO 6 INCHES FROM THE GROUND PRIOR TO TRAVELLING
-
DID THE OPERATOR MOVE AT A SAFE SPEED WITH THE LOAD
-
DID THE OPERATOR HAVE GOOD ALL ROUND UNOBSTRUCTED VISION
-
DID THE OPERATOR TRAVEL IN REVERSE WHEN THE VIEW WAS OBSTRUCTED
-
DID THE OPERATOR SOUND THEIR HORN WHEN ENTERING OR EXITING WAREHOUSES
-
DID THE OPERATOR SOUND THEIR HORN AT INTERSECTIONS
-
DID THE OPERATOR SOUND THEIR HORN WHEN ENTERING OR EXITING AISLES
-
DID THE OPERATOR TURN CORNERS SAFELY
-
DID THE OPERATOR DRIVE UP AND DOWN INCLINES SAFELY
-
DID THE OPERATOR LOOK BEHIND BEFORE REVERSING
-
DID THE OPERATOR MAINTAIN A MINIMUM OF 1 METRE DISTANCE FROM ALL PERSONNEL WHILST OPERATING
-
DID THE OPERATOR STOP THE FLT IN A SMOOTH MANNER
-
WAS THE FLT PARKED IN A SAFE AREA
POST OPERATION OF THE FLT
-
WERE THE FORKS PLACED ON THE GROUND
-
WERE THE CONTROLS PLACED INTO NEUTRAL
-
WAS THE PARKING BRAKE APPLIED
-
WAS THE FLT CLOSED DOWN TO PREVENT UNAUTHOURISED USE
-
WHAT WAS THE LEVEL OF COMPETENCE DISPLAYED BY THE FLT OPERATOR
-
RESULT OF THE OVERALL EVALUATION
-
WORDS OF ADVICE GIVEN TO THE FLT OPERATOR
-
DOES THE FLT OPERATOR AGREE TO; AND WILL ADHERE TO THE WORDS OF ADVICE GIVEN
-
OTHER COMMENTS
-
LIST ANY CONTROL MEASURES THAT NEED IMPLEMENTING
-
TIMEFRAME FOR IMPLEMENTATION OF ANY ADDITIONAL CONTROL MEASURES
-
SIGNATURE OF OPERATOR
-
SIGNATURE OF EVALUATOR