Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Location
Details of incident
-
Act of violence
-
Incident / near miss
-
Hazard
-
Property damage
-
Area (floor,room,level):
-
Date & time hazard/incident occurred
Incident Investigation
Details of incident/ hazard
-
Describe the activity undertaken at the time?
-
Describe the hazard incident as it occured
-
What did you do?
-
What factors do you feel caused this hazard/ incident?
-
Photo of incident/location
Incident investigation
-
If the incident was caused by a criminal act, have the police been notified?
-
Contact local police to report incident.
-
Has a work order been logged with building management in relation to this report?
-
Work order no:
-
Has the OC representative been consulted in relation to this report?
-
Notify OC representative on incident.
What were the factors that may have contributed to the incident/hazard? Consider areas below
System
-
Procedures
-
Workload
-
Maintenance
-
Task allocation
-
Audits
-
Other
-
Please specify:
Plant & Equipment
-
Size/weight
-
Design
-
Maintenance
-
Chemicals
-
Location
-
Other
-
Please specify:
Environment
-
Access
-
Housekeeping
-
Lighting
-
Weather/ temperature
-
Floor/ground surface
-
Other
-
Please specify:
People
-
Supervision
-
Training
-
Job competency
-
PPE not used
-
Safe work method
-
Other
-
Please specify:
Risk Assessment
Risk assessment
-
What is the worst possible consequence of this hazard/incident occurring?
What is the likelihood of this occurring? -
Insert risk matrix from media
-
High risk
Immediate action required -
Significant risk
Action required within 30 days -
Moderate risk
Action required within 1-3 months -
Low risk
Monitor the hazard / minimal action
Risk control
-
List any short term actions that have been implemented to control the risk of repeat.
What further action needs to be taken to control the risk?
-
If risk control not relevant please indicate N/A in relevant box.
Note: when identifying appropriate controls you should start at the top of the hierarchy (try to eliminate the hazard first ).
Elimination
-
Action to be taken
-
By who:
-
By when:
Substitution - replace item with a similar item that does the same job
-
Action to be taken
-
By who:
-
By when:
Isolation - put a barrier between the person and hazard
-
Action to be taken
-
By who:
-
By when:
Engineering controls - change of process, equipment, tools etc.
-
Action to be taken
-
By who:
-
By when:
Administration controls - guidelines, swms, procedures
-
Action to be taken
-
By who:
-
By when:
Personal Protective Equipment (PPE) - worn to provide a temporary barrier
-
Action to be taken
-
By who:
-
By when:
Investigation completed by:
-
Print name
-
Position
-
Company
-
Contact number