Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
Major Power Outage - Fatality Prevention Audit
-
Verify checklists and inspection forms are utilized correctly (Pre-Job Risk Assessment).
-
Completion Date:
-
Check substation documentation.
-
Completion Date:
-
Check signage and warnings at substations.
-
Completion Date:
-
Verify high voltage detectors are working properly.
-
Completion Date:
-
Verify mine power line heights are surveyed and documented.
-
Completion Date:
-
Verify mine power lines are identified and labeled correctly.
-
Completion Date:
-
Verify reflective devices are installed on power lines where heavy equipment is in operation.
-
Completion Date:
-
Auditor(s) Signature
-
Revision 1.0 iCloud posted document is the controlled copy. 06/18/13