Major Power Outage - Fatality Prevention Audit

  • Verify checklists and inspection forms are utilized correctly (Pre-Job Risk Assessment).

  • Completion Date:

  • Check substation documentation.

  • Completion Date:

  • Check signage and warnings at substations.

  • Completion Date:

  • Verify high voltage detectors are working properly.

  • Completion Date:

  • Verify mine power line heights are surveyed and documented.

  • Completion Date:

  • Verify mine power lines are identified and labeled correctly.

  • Completion Date:

  • Verify reflective devices are installed on power lines where heavy equipment is in operation.

  • Completion Date:

  • Auditor(s) Signature

  • Revision 1.0 iCloud posted document is the controlled copy. 06/18/13

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.