Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Personnel

Compliance Audit

  • Ensure Fire suppression seal is not broken.

  • Completion Date:

  • Inspect glass for cracks.

  • Completion Date:

  • Check horn for proper operation.

  • Completion Date:

  • Inspect all lights.

  • Completion Date:

  • Ensure back-up alarm is in good order and loud.

  • Completion Date:

  • Check under equipment for any oil leaks.

  • Completion Date:

  • Check all fluids for proper levels.

  • Completion Date:

  • Check windshield wipers.

  • Completion Date:

  • Check ROPS label is legible.

  • Completion Date:

  • Check park brake for proper operation.

  • Completion Date:

  • Check steps, guarding and handrails for proper mounting and are in place and not damaged.

  • Completion Date:

  • Check frame for cracks.

  • Completion Date:

  • Check steering for proper operation.

  • Completion Date:

  • Check emergency steering function with engine killed from bumper switch.

  • Completion Date:

  • Check condition of water tank / spray heads?

  • Completion Date:

  • Check front and rear suspensions.

  • Completion Date:

  • Check condition of seat belt and installation date.

  • Completion Date:

  • Housekeeping

  • Completion Date:

  • Verify pre-shift inspection is accurately completed.

  • Completion Date:

  • Ensure the by-pass valve on power step ladder works properly.

  • Completion Date:

  • Check tires / rims / lug nuts.

  • Completion Date:

  • Auditor(s) Signature

  • Revision 1.0 iCloud posted document is the controlled copy. 06/18/13

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.