Title Page
-
Site Name
-
Block
-
Plot Number
-
Conducted on
-
White Card date
-
Prepared by
-
Signature of inspector on completion
-
Location
General
-
Photos of plot, all rooms
-
All contractor works complete and fully snagged/de snagged?
-
Under sink, bath and shower tray checked to be clean and tidy? (photos required)
-
All kitchen units clean tidy and free of excess materials?
-
Any damage noted on inspection? (provide photos if yes)
Certification
-
External drains test complete and passed by NHBC?
-
Above ground drainage test complete and passed by NHBC?
-
NHBC CML cert achieved?
-
Building control inspection complete and signed off?
-
Water pressure test complete and cert recieved?
-
Fire protocol procedure followed, information recorded and uploaded to the shared drive?
Functionality Testing
-
Run and test shower including spraying enclosure and mastic junctions
-
Run and test bath including overflow and full drain test (video required)
-
Bath mounted shower screen sprayed and leak tested (video required)
-
Appliances run on a full cycle by site management and checked for leaks/errors
-
Fill basins to overflow and full drain test (video required)
-
Fill sink to overflow and full drain test (video required)
-
Hot water run and tested in all areas
-
Heating run and test including correct zoning if applicable
-
All window and door operation checked including keys
-
Sanitaryware, worktops, kitchen units, all glazing & white goods inspected to ensure free from any damage or defect
-
Door entry system tested including door release and video functionality (video required)