Title Page

  • Plot Number

  • Prepared by

  • Conducted on

  • Location
  • Aftercare Sign Off

General Info

  • Copy of the flat type/layout drawing

  • Generic photos of each room showing as much as possible

  • Photo(s) of hallway ceiling

  • Photo(s) of service cupboard ceiling(s)

Building Regs/NHBC Standards Compliance

  • Evidence of non combustable clipping

  • Evidence of SVP's and branchs wrapped

  • Evidence SVP's have been clipped at or near the centre of the run(s) on that floor

  • District heating lagging complete

  • SVP and pressure testing complete

Firestopping

  • Fire Stopping to Letterbox or Main Service Entry Point(s) (both sides)

  • Evidence of Fire Collars to SVPs (where visible)

  • Evidence of Fire Stopping to penetrations through party walls

  • Evidence of Firestopping to external walls

  • Evidence if baffle boxes installed as required

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.