Information

  • Location
  • Client / Site

  • Photo of site

  • Conducted on

  • Inspector:

  • 90mm framing-10mm maximum overhang in garage?

  • Is the frame plumb, square and straight especially in wet areas?

  • Have windows been raised to lintels?

  • Are windows packed, level, plumb and operating correctly?

  • Are all bulkheads and reveals straight, level and plumb?

  • Is top plate level & straight? Attention to long rooms.

  • Are corner blocks fitted and fixed correctly?

  • Have lower roof areas and garage roof been left off for scaffolding?

  • Have service ducts been installed and flooring cut out as per plan?

  • Have floor joists been installed as per manufacturers specs and especially at connections with steel beams?

  • Have compression blocks blocks been installed under high load areas?

  • Has sheet flooring been laid with sufficient glue & nails at correct centres? (200mm centres in field of sheet & 150mm centres 10mm from square edges and 25mm from tongue and groove edges.)

  • Has all bracing been installed in accordance with bracing plan?

  • Has structural steel been installed as per working drawings/engineering?

  • Are steel beams packed up 8mm above top plate with non compressive material and all connections above the ceiling line?

  • Have anti-skid blocks been fitted to saddle trusses?

  • Are all trimming noggings installed for fixing of plaster, rails etc.?

  • Have plaster trimmers been installed at 600mm centres at change of direction?

  • Has manhole trimming been complete?

  • blocking installed into steel beam? center of opening 300mm wide, sides of openings for roller tracks also 300mm and every 600 for gyprock

  • tv blocks installed? 1200-1700mm

  • blocking installed for roller door motor( center of opening, measure back 2700-3100mm

  • check sqaure set openings, niche sizes for sqaure/level/plumb

  • Ensure site is left in a neat condition and rubbish placed in a pile stacked away from entry and walkways, toilet and power supply

  • porch, balcony and alfresco ceilings battened down 450c's?

  • towel rail, toilet roll holder blocking installed?

  • blocking for stair hand rail installed?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.