Title Page

  • Location
  • Client:

  • Photo of the site:

  • Conducted on

  • Add signature

Quality Control

  • Are there any issues that was not picked up in a Pre inspection that has stopped work?<br><br>

  • Was sarking & Alcor installed to external Corners & Around Windows? PLEASE PROVIDE 2 PICTURES as evidence.

  • Are eaves Parallel to brick work?

  • Is the Cladding parallel/level to eave lining and governing points?

  • Was any extra work required? if yes please write below

  • are all gaps between cladding and trims filled?

  • are cladding nails proud or buried in to far?

  • are there fibro nails to eave sheet centres? (at least every second trimmer)<br>

  • are windows set for 10mm Gyprock?

  • What is the quality rating of this job?

  • Is there any information that needs to be documented?

  • Please add photos of sarking/alcor/lead flashings.
    please upload finish product photos below

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.