Title Page
-
Location
-
Client:
-
Photo of the site:
-
Conducted on
-
Add signature
Quality Control
-
Are there any issues that was not picked up in a Pre inspection that has stopped work?<br><br>
-
Was sarking & Alcor installed to external Corners & Around Windows? PLEASE PROVIDE 2 PICTURES as evidence.
-
Are eaves Parallel to brick work?
-
Is the Cladding parallel/level to eave lining and governing points?
-
Was any extra work required? if yes please write below
-
are all gaps between cladding and trims filled?
-
are cladding nails proud or buried in to far?
-
are there fibro nails to eave sheet centres? (at least every second trimmer)<br>
-
are windows set for 10mm Gyprock?
-
Is there any information that needs to be documented?
-
Please add photos of sarking/alcor/lead flashings.
please upload finish product photos below -
Add media