Title Page

  • Job Number

  • Site address

  • Building Description

  • Client

  • Inspected by:

  • Inspected on

  • Location

1.0 - General/siting

  • 1.1 - Siting and Setbacks in Accordance with Approved plans

  • 1.2 - Construction in Accordance with Approved Plans with

  • 1.3 - Frame height

  • 1.4 - Fire separation

  • 1.5 - Engineer's foundation inspection Certificate/Form 16 received?<br>

  • 1.6 - Land surveyor's set out Certificate/Form 16 received?

  • 1.7 - Termite Part A Certificate/Form 16 received?

  • 1.8 - Other

2.0 - Lower level

  • 2.1 - Wall frame & lintels

  • 2.2 - Trusses/binders/speed bracing

  • 2.3 - Point loads

  • 2.4 - Tie down

  • 2.5 - Bracing

  • 2.6 - Transfer blocks/strapping

  • 2.7 - Floor frame

  • 2.8 - Sub floor frame

  • 2.9 - Other

3.0 - Upper Level

  • 3.1 - Wall frame & lintels

  • 3.2 - Trusses/binders/braces

  • 3.3 - Point loads

  • 3.4 - Tie down

  • 3.5 - Bracing walls

  • 3.6 - Transfer blocks/strapping

  • 3.7 - Upper floor frame (bearers/joists)

  • 3.8 - Other

4.0 - Inspection Results

  • 4.1 - Satisfactory

  • 4.2 Re-Inspection Required

  • 4.3 - Satisfactory only when items are rectified & supervisor signs below

  • Supervisor's Signature: I. the site supervisor, confirm that all items on this inspection report have been rectified and inspected by myself. Name: _____________________________________________ Date: _______________________ Signature:

5.0 - Signatures

  • Inspector's signature & name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.