Title Page
-
BP No.
-
Report Title
-
Client
-
Site Address
-
Conducted on
-
Inspected by:
- Anthony Cregan
- Steve Bartley
- Nathan Schipplock
- Richard Jones
- Trystin Millar
-
Location
1.0 - Fire Resistance
-
1.1 - Type of Construction
-
1.2 - FRL: Fire source features
-
1.3 - Fire separation
-
1.4 - Fire/smoke door certification
-
1.5 - Floor/wall penetrations
-
1.7 - Electricity Supply
-
1.8 - Other
2.0 - Access and Egress
-
2.1 - Travel distances
-
2.2 - Exit dimensions/aggregate width
-
2.3 - Enclosure under stairs
-
2.4 - Installations in exits
-
2.5 - Stairway width/treads/risers
-
2.6 - Operation of latch
-
2.7 - Door swing
-
2.8 - Balustrades/handrails
-
2.9 - Exit signs
-
2.10 - Emergency lighting
-
2.11 - Emergency warning system
-
2,12 - Thresholds
-
2.13 - Re-entry fire isolated exits
-
2.14 - Rising/descending flights access
-
2.15 - Horizontal exits
-
2.16 - Other
3.0 - Services and Equipment
-
3.1 - Hydrants/FRL protection
-
3.3 - Fire hose reels
-
3.4 - Portable fire extinguishers
-
3.5 - Sprinklers
-
3.11 - Other
4.0 - Smoke Hazard Management
-
4.1 - Detection and alarm
-
4.2 - Occupant warning system
-
4.4 - FIP (block plan/emergency lighting)
-
4.6 - Other
5.0 - Safe Movement & Access
-
5.1 - Tactile indicators
-
5.2 - Handrail 300mm extensions/dome buttons
-
5.3 - Opaque risers
-
5.4 - Nosings (30% contrast)
-
5.5 - Balustrades - heights/openings
-
5.6 - Gradients to main access doors
-
5.7 - Entrance thresholds
-
5.8 - Circulation space (disabled)
-
5.9 - Disabled car parking
-
5.10 - PWD toilets
-
5.11 - Other
6.0 - Health & Amenity
-
6.2 - Waterproof wet areas
-
6.5 - Ail locks/ventilation
-
6.6 - Vermin proofing
-
6.7 - Room heights
-
6.8 - Other
7.0 - Energy Efficiency
-
7.1 - Is the construction in accordance with energy report?
-
7.2 - Other
8.0 - Certificates/Form 16
-
8.1 - Piling and/or foundations
-
8.2 - Structural (inc. roof framing, suspended floors)
-
8.3 - Timber roof truss
-
8.4 - Surveyors (set out)
-
8.5 - Surveyors (height)
-
8.6 - Acoustic performance requirementd
-
8.7 - Lifts (inc. emergency lifts)
-
8.8 - Wet area waterproof membrane installation
-
8.9 - Termite protection
-
8.10 - Fire rated floor and/or wall penetrations
-
8.11 - Glass balustrading
-
8.12 - Glazing (windows, doors) AS1288 and AS2208
-
8.13 - Glazing (shower screens)
-
8.14 - Air handling systems (other than smoke exhaust)
-
8.15 - Exit/emergency lighting - AS2293.1
-
8.16 - Floor coverings (critical radiant flux kW/m2) Spec C1.10a
-
8.17 - Energy Efficiency Installations (BCA Part J)
-
8.18 - Fire separation/fire rated ceilings/walls
-
8.19 - Fire/smoke doors, fire shutters/dampers etc.
-
8.20 - Portable fire extinguishers (AS2444)
-
8.21 - Fire hose reel flow test (0.33 L/s - 19mm diameter)
-
8.22 - Fire hose reel installation (AS2441)
-
8.23 - Smoke exhaust (inc. pressurization system)
-
8.24 - Hydrant flow/pressure test (inc. 2 hr static test - new installations) - Form 70
-
8.25 - Hydrant installation (AS2941.1)
-
8.26 - Pump set installation (AS2491)
-
8.27 - Sprinkler installation (AS2118)
-
8.28 - Detection and alarm system (AS1670.1 & AS2220)
-
8.29 - Queensland Fire & Rescue Authority Final
-
8.30 - Local Authority Plumbing Final
-
8.31 - Other
9.0 - Town Planning
-
9.1 - Have applicable conditions of MCU been satisfied?
-
9.2 - Other
10.0 - Signature
-
10.1 - Inspector's name, date & signature