Title Page
-
BP No.
-
Site Address
-
Building Description
- Low set dwelling
- Dwelling alterations/additions
- Minor Works (garages/carports etc..
- Two storey dwelling
- Three storey dwelling
- Townhouses
-
Client
-
Inspected by:
-
Inspected on
-
Location
1.0 - General Items
-
1.1 - Approved plans on site
-
1.2 - Boundary setbacks
-
1.3 - Layout as approved
-
1.4 - Footing depth/width
-
1.5 - Base of excavation clean
-
1.6 - Mesh and Reo Sizes as per Engineers detail.
-
1.7 - Reinforcing steel in place
-
1.8 - Excavation clear of vegetable material
-
1.9 - Engineer's foundation inspection Certificate/Form 16 received?
-
1.10 - Land Surveyor's set out Certificate/Form 16 received?
-
1.11 - Termite Part A Certificate/Form 16 received?
2.0 - Inspection Result
-
2.1 - Satisfactory
-
2.2 - Not Satisfactory - Certificates/Form 16 as per items 1.9, 1.10, 1.11 are required.
-
2.3 - Not satisfactory & a reinspection is required to be booked once items are rectified
-
2.4 - Satisfactory only when items are rectified & supervisor signs below
-
2.5 - Supervisor's Signature: I, the site supervisor. confirm that all items listed on this inspection report have been rectified and inspected by myself. Name: _____________________________________ Date: _________________________ Signed:
3.0 Signature
-
3.1 - Inspector's signature & name