Information
-
Site Address:
-
Conducted on
-
Conducted by
-
Location
External
-
Are the overall slab dimensions as per plan?
-
Has the slab an even surface?
-
Is the slab surface clean of chalking?
-
Are there any slab overhangs?
-
Are all step downs correct?
-
Are all parapets strapped/braced as per plan
-
Are additional sumps required?
-
Are eave dimentions as per plan?
-
Isthe frame designed as per elivations?
-
Additional Comments:
-
Photo if required
Entry
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Is the correct front door unit installed?
-
Is the portico step down correct?
-
Are all portico posts installed plumb/level and as per plan?
-
Additional comments:
PANTRY
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads
-
Have all ceiling plaster trimmers and change of direction trimmers been installed?
-
Are all internal corners plumb and level?
-
Has bracing been placed as per engineering?
-
Are all windows and door dimensions correct? (width/height/glazing)
-
Have plumbing wastes been located correctly?
-
Are all lower roofs completed correctly and as per truss layout?
-
Additional Comments:
-
Photo if required
LAUNDRY
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads
-
Have all ceiling plaster trimmers and change of direction trimmers been installed
-
Are all internal corners plumb and level
-
Has bracing been placed as per engineers
-
Are all windows and door dimensions correct? (width/height/glazing)
-
Have plumbing wastes been located correctly?
-
Are all lower roofs completed correctly and as per truss layout?
-
Additional Comments:
-
Photo if required
LIVING ROOM
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads
-
Have all ceiling plaster trimmers and change of direction trimmers been installed
-
Are all internal corners plumb and level
-
Has bracing been placed as per engineering?
-
Are all windows and door dimensions correct? (width/height/glazing)
-
Are all lower roofs completed correctly and as per truss layout?
-
Additional Comments:
-
Photo if required
KITCHEN , DINING AREA
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads?
-
Have all ceiling plaster trimmers and change of direction trimmers been installed?
-
Are all internal corners plumb and level
-
Has bracing been placed as per engineering?
-
Are all windows and door dimensions correct? (width/height/glazing)
-
Have plumbing wastes been located correctly
-
Are all lower roofs completed correctly and as per truss layout?
-
Additional Comments:
-
Photo if required
GARAGE
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads?
-
Have all ceiling plaster trimmers and change of direction trimmers been installed?
-
Are all internal corners plumb and level?
-
Has bracing been placed as per engineering?
-
Have roller door noggins been installed as per detail?
-
Are all lower roofs completed correctly and as per truss layout?
-
Check garage boundary wall height. Does it comply to town planing?
-
Additional Comments:
Structural Steel
-
Have all beams been installed as per plan? (Size/location)
-
Have all steel connections been installed as per Engineering?
-
Have all steel connections and cleans been welded and completed?
-
Have all steel struts been installed?
-
Additionally comments:
-
Photo if required
Joist and Sub floor
-
Has all chipboard flooring been glued and nailed off?
-
Have all joist been installed as per joist layout?
-
Have all brackets and bracing been installed as per joist layout?
-
Have all strong backs been installed correctly and connected to required beams?
-
Additional Comments:
Party Wall
-
Has the party wall been inspected by the surveyor?
-
Is the party wall installed as per spec?
-
Is the party wall damaged in any section?
-
Does the party wall terminate at the end of the framed cavity?
-
Are clips installed as per spec?
-
Does the party wall terminate at the top of parapet/roof?
-
Is there adequate fire check coverage between ground floor and first floor? (Min 150mm bellow ground floor top plate)
-
Additional comments:
-
Photo if requried
STAIR VOID
-
Do all lower walls line up straight to upper walls?
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Are all void dimensions as per plan?
-
Do we have the required head room between ceiling and stairs?
-
Additional Comments:
STUDY
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads
-
Have all ceiling plaster trimmers and change of direction trimmers been installed
-
Are all internal corners plumb and level
-
Has bracing been placed as per engineers
-
Are all windows and door dimensions correct? width and height?
-
Are all lower roofs completed correctly and as per truss layout?
-
Additional Comments:
-
Photo if required
MASTER BEDROOM
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads
-
Have all ceiling plaster trimmers and change of direction trimmers been installed
-
Are all internal corners plumb and level
-
Has bracing been installed as per engineers
-
Are all windows and door dimensions correct? (width/height/glazing)
-
Have studs been placed at 300cts at end of WIR
-
Are all lower roofs completed correctly and as per truss layout?
-
Additional Comments:
-
Photo if required
MASTER ENSUITE
-
Shower step down accurate and correct and allowed for shelf wall if required?
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads?
-
Have all ceiling plaster trimmers and change of direction trimmers been installed?
-
Are all internal corners plumb and level?
-
Has bracing been placed as per engineering?
-
Are wastes and plumbing located in correct positions
-
Is shower box located correctly and studs placed at 300cts around shower?
-
Are all windows and door dimensions correct? (width/height/glazing)
-
Are niches/shelf walls placed in correct position and correct size
-
Are all lower roofs completed correctly and as per truss layout?
-
Additional Comments:
-
Photo if required
BEDROOM 2
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads
-
Have all ceiling plaster trimmers and change of direction trimmers been installed
-
Are all internal corners plumb and level
-
Has bracing been installed as per engineering
-
Are all windows and door dimensions correct? (width/height/glazing)
-
Are all lower roofs completed correctly and as per truss layout?
-
Additional Comments:
-
Photo if required
BEDROOM 3
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads
-
Have all ceiling plaster trimmers and change of direction trimmers been installed
-
Are all internal corners plumb and level
-
Has bracing been installed as per engineering
-
Are all windows and door dimensions correct? (width/height/glazing)
-
Are all lower roofs completed correctly and as per truss layout?
-
Additional comments:
-
Photo if required
BEDROOM 4
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads
-
Have all ceiling plaster trimmers and change of direction trimmers been installed
-
Are all internal corners plumb and level
-
Has bracing been placed as per engineers
-
Are all windows and door dimensions correct? (width/height/glazing)
-
Are all lower roofs completed correctly and as per Plan?
-
Additional comments:
-
Photo if required
BATHROOM
-
Shower stepdown accurate and allowed for shelf wall if required?
-
Are all room dimensions as per plan? (Ceiling heights and overall dimentions)
-
Have studs been placed under loads
-
Have all ceiling plaster trimmers and change of direction trimmers been installed
-
Are all internal corners plumb and level
-
Has bracing been placed as per engineers
-
Are wastes and plumbing located in correct positions
-
Is shower waste located correctly and studs placed at 300cts around shower
-
Are all windows and door dimensions correct? (width/height/glazing)
-
Are niches/shelf walls placed in correct position and correct size
-
Are all lower roofs completed correctly and as per truss layout?
-
Additional Comments:
-
Photo if required
Roof
-
Are all trusses installed as per truss layout?
-
Is all roof speed bracing completed as per truss layout?
-
Isall speed brace wrapped under top plates correctly?
-
Are all multi grips/truss ties/ creeper connectors installed as per truss layout?
-
Are all valley boards installed?
-
Are all slip blocks installed to all valley trusses?
-
Are all bottom chord ties installed as per roof layout?
-
Are all shear blocks installed?
-
Are all L brackets installed where required?
-
Are tail struts installed to all hips?
-
Do all girder trusses have the required double studs under them?
-
Has the heating unit been allowed for and designed?
-
Additional comments:
-
Photo if required
GENERAL POINTS ON FRAME
-
Frame pass?
-
This frame has been inspected by
-
The frame items have been completed by