Information

  • Inspection Type

  • Job Number

  • Lot Address

  • Conducted on

  • Customer Name

  • Customer Contact Details

  • Inspector

  • In accordance with clause 37.0 of you New Homes Building Contract between Thomas Archer and the owner of the above property, the below is a written list of know defects and incomplete work. The owner and the builders representative are to sign the list and each retain copy.

External

  • Facade

  • Porch

  • Left side of house

  • Back of house

  • Alfresco

  • Right side of house

  • Garage

Internal

  • Entry

  • Lounge

  • Study

  • Powder room

  • Rumpus

  • Theatre

  • Living

  • Meals

  • Kitchen

  • Laundry

  • Stairs

  • Activity

  • Bed 1

  • Bed 1 Ensuite

  • Bed 2

  • Bed 2 Ensuite

  • Bed 3

  • Bed 3 Ensuite

  • Bed 4

  • Bed 4 Ensuite

  • Bed 5

  • Bed 5 Ensuite

  • Bathroom

  • 1st floor Powder / WC

  • 1st floor Hallway

Timber / Laminate Flooring

  • Is Timber / Laminate flooring clear of scratches and or dints

Further information noted on site

  • Further information noted on site

Footpath bays damaged

  • No. of bays damaged

  • Note: Broken footpath bays adjacent to the crossover or damaged caused prior to the builder commencing works are not the builders responsibility. No action by the builder will be made to these areas. The owner should now contact their local council to complete an asset inspection to obtain any deposit paid prior to site start

Inspection Completion

  • Select date

  • I/We (client) agrees that the above items form the final list of known defects

  • The builder agrees that the above items form the final list of known defects

Note

  • All items on the Practical Completion Report will be assessed and reviewed using the below and repaired if deemed necessary. National Construction Code (NCC). Building Code of Australia (BCA). Building Regulations as specified by appointed RBS. Australian Standards (AS). VBA Guide to Standards and Tolerances 2015 (GST). Signed contract specification and or variations. Final signed plans and colour documentation.

Re-inspection Completion

  • Select date

  • I/We (client) agrees that the above items are now rectified or complete

  • The builder agrees that the above items are now rectified or complete

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.