Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
MATERIALS FOR MAINTENANCE
-
Touch up paint tins onsite
-
Painters maintenance sticker in meter box
-
Ceramic tiles onsite
-
Spare roof tiles onsite
-
Manuals for appliances in top draw
-
Touch up texture tubs onsite
INTERNAL AREAS - DEFECT ITEMS COMPLETED
-
kitchen
-
Scullery
-
Pantry
-
Meals area
-
Dinning area
-
Front passage
-
Laundry
-
Bed 1
-
ensuite
-
W/C ensuite
-
Study
-
Home theatre
-
Bed 2
-
Bed3
-
Bed 4
-
Bed 5
-
Bathroom
-
W/C 2
-
Rear passage
ENTRANCE SETS AND DEAD LOCKS
-
FRONT DOOR DEAD LOCK AND ENTRANCE SETS OPERATES
-
SHOPPER DOOR DEAD LOCK AND ENTRANCE SET OPERATES
-
ALUMINIUM SLIDING DOOR LOCKS OPERATE
EXTERNAL AREAS- DEFECT ITEMS COMPLETED
-
Front elevation
-
LHS elevation
-
RHS elevation
-
Rear elevation
-
Kerb
-
Paving
COMPLETION
-
Both builder and client acknowledge that they have conducted a final inspection of the home and agree that all defect items from 1st Practical Completion are complete and that there are no outstanding items remaining.
-
PCI FORM
CLIENTS SIGNATURE
-
Add signature
SUPERVISORS SIGNATURE
-
Add signature