Title Page

  • Conducted on

  • Prepared by

  • Add location
  • Add media

  • Site safety management plan onsite

  • Plans, addenda and engineers have been reviewed and assessed

  • Correct revision plans are being used

  • Working from correct Engineers details- tie downs and overlays

  • Materials

  • Brick count completed

  • Correct door frames onsite

  • Correct lintels are onsite

  • Set out completed

  • Termite home guard set out and installed - overhanging external face brick by 20mm - not cut off

  • Damp course additive used external And internal perimeter walls bottom course including wet areas

  • Correct bonding of masonry as per addenda

  • Wall ties in accordance with AS 3700<br>

  • Wall ties embedded at least 50mm into bedjoint

  • Walls ties have a minimum 15mm cover from any exposed surface

  • If coastal conditions stainless steel ties used

  • Wall ties placed within a minimum of 300mm from any line of lateral support, control joint or perimeter opening

  • Wall ties spaced no greater than 600mm in any direction

  • Wall ties placed in every bedjoint at every intersecting wall to perimeter cavity

  • Wall ties installed adjacent to PWP and structural columns as per detail/ engineers

  • Wall ties have been installed correctly as to not allow egress of moisture / water to transfer from external to internal brickwork

  • Door frames

  • Frames installed correct handing

  • Frames installed level and solid

  • Frames clean free of mortar

  • W/c lift off hinge frames installed as per plan

  • Door frame ties installed

  • 3 hinged frames installed as per plan

  • Timber door frames ties installed

  • Flashings ( DPC's ) installed in accordance AS4773.2

  • Head flashings installed a minimum 150mm beyond each side of the opening and flashing is within 300mm of the top of the window - AS 4773.2

  • Flashings are not breached or punctured except when the flashing is neatly pierced to allow for tie down straps and rods

  • Mortar

  • Finish to mortar joints is as specified in addenda

  • Correct mortar has been used e.g M3 , M4

  • Mortar colour to face brickwork is consistent

  • Masonry units

  • Maximum thickness of bedjoint does not exceed 20mm

  • Masonry units laid on a full bed of mortar

  • Sill bricks laid with a consistent slope for drainage of water

  • Deviation from specified cavity width does not exceed 15mm +/-

  • Cavity is free from mortar droppings and any other material that may bridge the cavity

  • No shattered masonry units have been installed

  • Deviation of bedjoint from horizontal does not exceed +/- 10mm in any 10m length

  • Deviation from specified thickness of bedjoint does not exceed +/- 3mm

  • Minimum perpend thickness 5mm

  • Deviation from specified thickness of perpend does not exceed +/- 10mm max

  • Masonry longreach installed as per detail and engineers

  • Maximum 2mm deviation of any exposed face brick surface

  • Chases in masonry units do not exceed 25mm

  • All lintels and Tbars installed as per engineers detail and specifications.

  • Hoop iron straps installed at correct coursing heights and centres as specified

  • Tie downs installed in accordance with engineers details and specifications

  • Measurements

  • All internal room measurements are as per plan

  • All external measurements including openings as per plan

  • Masonry units laid to correct coursing heights as per corresponding plan- details, elevation and engineers

  • All Walls are plumb and do not exceed the maximum deviation within the storey from a vertical line through to the base member of +/-10mm per 3m of height or 0.05 the thickness of the leaf

  • Lintels and Tbars have sufficient bearing as specified by engineers

  • Top course brick work level for wall plate

  • Photo of plans with completed brick check dimensions

  • 2 x leafs of verticore Bricks placed at rear of job for tiler and 1 leaf of face brick for any repairs / da,aged bricks

  • Site cleanliness and safety

  • All rubbish placed in bin and contained

  • Rubble placed in one pile next to bin

  • Job has been left clean, perimeter of job has been raked of all loose building rubble inside of job is clean

  • Trades electrical equipment tagged in date

  • No milk crates used on site

  • Hazard identification forms utilised

  • Tool box meetings held

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.