Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PCI CONFIRMATION
-
-
CONFIRMED DATE PCI
CLICK HOME UP TO DATE
Builders sign visible
-
Add media
Final Site clean complete
-
-
Add media
House clean completed
WARRANTY FORMS IN KITCHEN DRAW
HOUSE CHECK
-
Electrical final complete
-
Gas final complete
-
Plumbing final complete
Warranty stickers in meter box
-
Photo of stickers inside meter box
-
TERMITE WARRANTY STICKER
-
Waterproofing warranty sticker
-
Roof tile maintenance
-
Dulux sticker - completed
-
Paving compaction date
Maintenance material left onsite
-
Add media
-
Touch up paint left in pantry
-
Unitex tubs left in linen
-
Spare floor and wall tiles left on site in linen -10 of each
-
10x spare roof tiles left in garage
Internal checks
-
All cabinets including doors and draws in working order
-
All Appliances operating
-
Vanity basins and sinks no leaks
-
All striker plates to doors adjusted
-
Weather seals and draft seals fitted to timber frames and entrance doors
-
All doors adjusted and not binding on frames
-
Tiling to shower floors have sufficient fall<br>
-
Shower screens checked for leaks
-
All wastes and drains not blocked
-
Quality of ceilings and cornice throughout - all joins, soffits and screws flushed out properly
-
All painting items complete including gloss to tops and bottoms of doors
-
Pre PCI maintenance completed
-
All entrance sets and dead Locks operate and have the same job number on cylinder
External items
-
Garage door installed and operating
-
Paving complete
-
Unitex
-
HWU is functional
-
All external paint works completed - vent pipes, copper pipes, valley trays, roof flumes, conduits, eave sheets and cladding
-
Add signature
-
Select date