Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

PCI Weekly Inspection Checklist

  • PCI Branch - Austin - 549

  • Job No.

1. PAPERWORK

  • 1.1 Completed? Review the following as a minimum: Job Site Safety Procedures, Fall Protection Plan, OSHA Posting, AWP Checklists, Pre-Task Plan, and Head Stress Checklist

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 1.2 Posted

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

2. HOUSEKEEPING

  • 2.1 Our work area

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 2.2 Overall job site

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 2.3 Drinking Water

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 2.4 Sanitation Facilities

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

2. FIRE PROTECTION

  • 2.1 Extinguishers (fully charged, inspected, & certified)

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 2.2 Fire hazards (material liquids)

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

3. HAND TOOLS

  • 3.1 General Condition

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 3.2 Proper Tool for the Job

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

4. POWER TOOLS

  • 4.1 General Condition

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 4.2 Grounded

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 4.3 Guards in Place

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

5. ELECTRICAL

  • 5.1 Condition of Electric Tools

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 5.2 GFCI's in Use

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 5.3 Extension Cord Placement

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 5.4 Extension Cord Not in Water

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

6. LADDERS

  • 6.1 General Conditions

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 6.2 Proper Use

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 6.3 Straight Ladders Tied Off

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 6.4 Safety Feet in Good Condition

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

7. POWDER-ACTUATED TOOLS

  • 7.1 Face Shields and Ear Plugs in Use

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 7.2 Operator Licensed

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 7.3 Warning Signs Posted

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 7.4 Loads Stored & Disposed of Properly

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

8. PERSONAL PROTECTIVE EQUIPMENT

  • 8.1 Hard Hats

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 8.2 Eye Protection

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 8.3 Hearing Protection

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 8.4 Back Supports

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 8.5 Fall Protection

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 8.6 Respirators

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 8.7 Protective Clothing

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 8.8 Gloves - level 3 cut resistant

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 8.9 Kevlar sleeves - installing, handling, or demolishing IMP

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

9. VEHICLES

  • 9.1 General Condition

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 9.2 Forklift Licenses

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

10. FIRST AID

  • 10.1 First Aid Kits Available/Stocked

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

11. FLOORS, STAIRS, WALKWAYS

  • 11.1 Guardrails

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 11.2 Floor Openings Covered

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 11.3 Floor Coverings Secured

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 11.4 Floor Coverings Marked

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 11.5 Adequate Lighting

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 11.6 Stair Pans Filled

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 11.7 Walkways Clear

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

12. MANLIFTS -AWPs

  • 12.1 All Guardrail Gates/Chains Closed

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 12.2 Body Harness and Lanyard

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 12.3 All Operators Trained have a license

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 12.4 Operated on Level Footing

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

13. WELDING

  • 13.1 Protective Equipment is Being Used

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 13.2 Fire Extinguishers in Immediate Vicinity of Fire Watch(if needed)

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

14. MATERIALS HANDLING HORIZONTAL

  • 14.1 Materials Properly Stacked

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 14.2 Material Handling Equipment in Good Condition

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 14.3 Proper Handling and Lifting Practices

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 14.4 Excessive Material Not in the Way

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

15. MATERIAL HANDLING VERTICAL

  • 15.1 Supervised by a Competent Person

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 15.2 Is the Swing Zone Clear

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • 15.3 Slings in Good Condition

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

17. Scaffolding

  • 17.1 Scaffolding has been inspected

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

18. OTHER ITEMS

  • 18.1 Type in the issue and information.

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

CORRECTIVE ACTIONS

  • Enter any corrective actions that will be undertaken

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • Enter any corrective actions that will be undertaken

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • Enter any corrective actions that will be undertaken

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

CORRECTIVE ACTIONS

  • Enter any corrective actions that will be undertaken

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • Enter any corrective actions that will be undertaken

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • Enter any corrective actions that will be undertaken

  • RESPONSIBLE PARTY?

  • PCI PERSONNEL RESPONSIBLE FOR CORRECTION?

  • DATE CORRECTED?

  • Conducted by:

  • Reviewed by:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.