Title Page

  • Job Name

  • Job Number

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Foreman

  • 1. Verify that all required materials and equipment are stocked and in correct locations/ Verify accuracy of layout prior to framing.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 2. Verify accuracy of control lines, grid lines and benchmarks provided by others.

  • Add signature

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 3. Verify area is clean and free of debris prior to starting work.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 4. Verify that the all clips and top track are installed prior to fireproofing.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 5. Verify that the wall framing is straight, square, plumb and true within tolerance.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 6. Verify that electrical and plumbing rough-in and/or insulation does not protrude past the plane of studs.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 7. Re-verify that the wall framing is straight, square, plumb and true after MEP rough-in.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 8. Verify intersections at rated walls are correct.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 9. Verify that the pin attachments are correctly spaced and secure.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 10. Verify screws are installed in accordance with engineered shop drawings.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 11. Verify stud spacing is correct.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 12. Verify furred walls are braced to substrate.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 13. Verify that slap studs are in place.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 14. Verify that door openings are accurately sized and plumb with tape or level.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 15. Verify that the door frame elevations are correct.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 16. Verify that all headers are framed in accordance with plans and specifications and are square.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 17. Verify that king studs are installed correctly.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 18. Verify HM door frames are installed plumb, square and level with proper anchors.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 19. Verify that the backing is installed correctly and proper gauge and size.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 20. Verify that bridging (if required) is installed correctly.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 21. Verify that Non-Rated control joints are spaced no greater than 30 feet on center. Verify that there is a stud on each side of the control joint.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 22. Verify that Rated control joints and openings have drywall installed on face of stud within the cavity.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 23. Verify that the openings for access doors, recessed fire extinguisher cabinets and bath accessories are framed concurrent with production framing.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 24. Verify that layout for MEP penetrations is accurate and complete.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 25. Verify that plumbing pipes occurring within 6” of studs have been painted on floor.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

Corrective Actions

  • Enter any corrective actions that will be undertaken

  • Responsible Party?

  • PCI Personnel Responsible for correction.

  • Select date

  • Enter any corrective actions that will be undertaken

  • Responsible Party?

  • PCI Personnel Responsible for correction.

  • Select date

  • Enter any corrective actions that will be undertaken

  • Responsible Party?

  • PCI Personnel Responsible for correction.

  • Select date

  • Conducted By:

  • Reviewed By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.