1. Confirm that soffit and ceilings heights are off of concrete, finish floor or benchmark established by the General Contractor.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
2. Prior to soffit/ceiling framing, verify that all required drywall top-out, caulking and fire taping is completed above ceiling.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
3. Verify that the horizontal track required for a joisted ceiling or soffit is attached through the drywall to a vertical stud.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
4. Verify screw attachment of studs to tracks (top, bottom and each side).
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
5. Verify stud spacing is correct.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
6. Verify kicker, strong-back, bridging or wire installation is complete, if required.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
7. Verify that the horizontal stud layout does not interfere with MEPs.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
8. Verify that the openings for access doors are framed concurrent with production framing.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
Corrective Actions
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Conducted By:
-
Reviewed By: