Title Page
-
Job Name
-
Job Number
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Foreman
-
1. Verify that all required materials and equipment are stocked and in correct locations.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
2. Verify accuracy of control lines, gridlines and benchmarks provided by others.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
3. Verify Layout accuracy prior to framing.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
4. Verify area is clean and free of debris prior to starting work.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
5. Verify stud spacing is in accordance with engineered shop drawings. If shop drawings are not required, refer to plans and specs.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
6. Verify stud gauge and galvanization are in accordance with engineered shop drawings. If shop drawings are not required, refer to plans and specs.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
7. Verify misc clips, bridging and accessories are installed in accordance with engineered shop drawings. If shop drawings are not required, refer to plans and specs.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
8. Verify that the pin attachments are correctly sized and spaced per engineered shop drawings. If shop drawings are not required, refer to plans and specs.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
9. Verify screws are installed in accordance with engineered shop drawings. If shop drawings are not required, refer to plans and specs.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
10. Verify that the wall framing is straight, square, plumb and true within tolerance.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
11. Verify that door and window openings are accurately sized, plumb and square.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
12. Verify if window shop drawings are available for rough opening sizes. If rough opening sizes are not listed on contract documents then have the G.C. sign-off.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
13. Verify that the door and window rough openings elevations are correct.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
14. Verify that all headers are framed in accordance with engineered shop drawings. If shop drawings are not required, refer to plans and specs.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
15. Verify that king studs are installed in accordance with engineered shop drawings. If shop drawings are not required, refer to plans and specs.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
Corrective Actions
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Conducted By:
-
Reviewed By: