Title Page
-
Job Name
-
Job Number
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Foreman
-
1. Clean at base of wall to ensure caulking adhesion and to prevent bows at base.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
2. Hang rated, priority or interference walls first.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
3. Prior to drywall hang on partitions, identify the appropriate hanging procedures (i.e. hold drywall ¼” off floor).
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
4. Stand-up board wherever possible to minimize joints.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
5. Verify 8” on center screw spacing 3/8” from edge of board at perimeter.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
6. Verify screw spacing in the field is per local code or 12” O.C. minimum.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
7. Verify that all drywall is secure to the framing.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
8. Verify drywall overlap, staggered or off set joints occurs at multiple layer rated assemblies.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
9. Verify HM door frames are square, level and king studs are screwed properly during drywall install.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
10. Cut out all electrician boxes, plumbing, HVAC openings and access doors.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
11. Verify that all inside corners are snug, not forced.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
12. Hold drywall back ¼” where L bead is required.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
13. Verify that drywall on soffits and doors are hung correctly to prevent cracking.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
14. Eliminate “butt” joints whenever possible on ceilings and walls.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
15. Verify that all caulking at bottom of the drywall is wiped clean.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
16. Mark on floor prior to hanging, the locations of all boxes and switches and make sure all marks are cut out at walls and ceilings.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
17. Verify that “belly bands” do not occur.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
18. Verify that drywall screws are driven within tolerance (not over or under driven).
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
19. “Misses” - Do not leave screws that have missed the studs protruding from the surface of the drywall.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
20. Do not install damaged drywall. Cut-out all “fractured” drywall and replace.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
21. Verify that no screws have been installed in no-screw zone near plumbing.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
Corrective Actions
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Conducted By:
-
Reviewed By: