Title Page

  • Job Name

  • Job Number

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Foreman

  • 1. Clean at base of wall to ensure caulking adhesion and to prevent bows at base.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 2. Hang rated, priority or interference walls first.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 3. Prior to drywall hang on partitions, identify the appropriate hanging procedures (i.e. hold drywall ¼” off floor).

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 4. Stand-up board wherever possible to minimize joints.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 5. Verify 8” on center screw spacing 3/8” from edge of board at perimeter.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 6. Verify screw spacing in the field is per local code or 12” O.C. minimum.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 7. Verify that all drywall is secure to the framing.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 8. Verify drywall overlap, staggered or off set joints occurs at multiple layer rated assemblies.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 9. Verify HM door frames are square, level and king studs are screwed properly during drywall install.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 10. Cut out all electrician boxes, plumbing, HVAC openings and access doors.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 11. Verify that all inside corners are snug, not forced.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 12. Hold drywall back ¼” where L bead is required.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 13. Verify that drywall on soffits and doors are hung correctly to prevent cracking.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 14. Eliminate “butt” joints whenever possible on ceilings and walls.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 15. Verify that all caulking at bottom of the drywall is wiped clean.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 16. Mark on floor prior to hanging, the locations of all boxes and switches and make sure all marks are cut out at walls and ceilings.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 17. Verify that “belly bands” do not occur.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 18. Verify that drywall screws are driven within tolerance (not over or under driven).

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 19. “Misses” - Do not leave screws that have missed the studs protruding from the surface of the drywall.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 20. Do not install damaged drywall. Cut-out all “fractured” drywall and replace.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 21. Verify that no screws have been installed in no-screw zone near plumbing.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

Corrective Actions

  • Enter any corrective actions that will be undertaken

  • Responsible Party?

  • PCI Personnel Responsible for correction.

  • Select date

  • Enter any corrective actions that will be undertaken

  • Responsible Party?

  • PCI Personnel Responsible for correction.

  • Select date

  • Enter any corrective actions that will be undertaken

  • Responsible Party?

  • PCI Personnel Responsible for correction.

  • Select date

  • Conducted By:

  • Reviewed By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.