Title Page

  • Job Name

  • Job Number

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Foreman

  • 1. Confirm bench mark, layout and ceiling heights as needed with GC.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 2. If deviating from drawings, GC to sign off on change before proceeding.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 3. Wires within 15 degrees of plumb and free from obstacles (check specs) if over degree tolerance install counter splayed wire.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 4. Grid level within 1/8” in 12’.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 5. Grid cut-in straight.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 6. Grid not cut short, specifically at angled walls.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 7. Black iron bridging utilized, no attachment to MEP’s.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 8. Black iron doubled over five feet.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 9. Ensure grid is square when grid installation starts. (Not after completion)

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 10. Wires wrapped 3 times in 1 inch (hospital wrap) or 3 times within 3” and installed 4’ OC in each direction.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 11. Remove jet line after grid installation.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 12. Use clean white pop rivets (where specs require).

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 13. Hang additional wires at back to back light fixtures or other heavy devices.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 14. Grid and wall angle to be free of fingerprints and smudges.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

  • 15. Wall angle miters to be clean. Extra care taken on 2 inch wall angle.

  • Responsible Party

  • PCI Personnel Responsible For Correction?

  • Date Corrected?

Corrective Actions

  • Enter any corrective actions that will be undertaken

  • Responsible Party?

  • PCI Personnel Responsible for correction.

  • Select date

  • Enter any corrective actions that will be undertaken

  • Responsible Party?

  • PCI Personnel Responsible for correction.

  • Select date

  • Enter any corrective actions that will be undertaken

  • Responsible Party?

  • PCI Personnel Responsible for correction.

  • Select date

  • Conducted By:

  • Reviewed By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.