Title Page
-
Job Name
-
Job Number
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Foreman
-
1. As a general rule: Ceiling tiles to be installed after building is enclosed, and area is climatized.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
2. Perimeter tiles flush and clean with wall angle.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
3. Tiles sit flush in grid.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
4. Sprinkler holes cut tight around penetration… no caulking.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
5. Directional tiles to run same direction. Remind installers often to watch arrow or key.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
6. Tiles are free from fingerprints and smudges (use baby powder if needed).
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
7. Concealed and glue-up tile: avoid gaps.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
8. GC to accept area immediately after installation in writing (ensures punch list work will actually be trade damage work).
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
9. Regular tile: perimeter cuts clean… the sharper the knife blade, the better.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
-
10. Ceiling tiles to be stocked/staged laying flat. If left upright, they may warp.
-
Responsible Party
-
PCI Personnel Responsible For Correction?
-
Date Corrected?
Corrective Actions
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Enter any corrective actions that will be undertaken
-
Responsible Party?
-
PCI Personnel Responsible for correction.
-
Select date
-
Conducted By:
-
Reviewed By: