Information

  • Inspection No.:

  • Inspection Date:

  • Project Name:

  • Client Name:

  • Inspection Conducted by:

  • Subcontractors onsite:

  • Note: Use of this form is not intended to be all encompassing, but is to be used to assist those responsible for implementation of safety procedures, practices , and general compliance with OSHA standards. This form will be used on a daily basis and all items noted for correction are to be monitored until noted as corrected on this form. A copy of this form is to remain onsite in the field office. Copy to main office and to any parties deemed necessary or appropriate.

General Observations:

  • Describe contractor activities:

  • Using floor plan location identifiers, describe construction traffic pathway. Note any healthcare staff traffic patterns that coincide with construction paths.

Project Observations:

  • Is the static pressure greater than -0.02"w.g. (list actual readings in comments, identify manometer by serial number and location)?

  • Is the manometer tubing connected properly?

  • Is the manometer calibration up to date (list last calibration date, identify the manometer by serial number)?

  • Do the negative air machine (NAM) and exhaust ducts have good integrity?

  • Have the NAM pre-filters changed per ICRA requirements?

  • Have the manometers alarm has not been silenced?

  • Has the NAM HEPA filters changed per manufacturers instructions?

  • Are the NAM's on emergency power?

  • Are the manometers on emergency power?

  • Is the anteroom clean, with no dust, or debris?

  • The anteroom and work area doors are not being opened at the same time?

  • The HEPA vacuum is operating properly?

  • The HEPA vacuum is being used by construction personnel when leaving the work area?

  • All contractor's equipment is clean when passing through common pathways (elevators/corridors)?

  • Is the work area is clean and orderly?

  • Are the contractors complying with the traffic patterns?

  • Are the adhesive mats being changed before becoming ineffective?

  • Are the Corredor's free of construction related dust or debris?

  • Do the interior containment walls have good integrity?

  • Do the exterior containment walls have good integrity?

  • Is the Environmental Containment Unit (ECU) being used appropriately?

  • Are the contractors clearly displaying their ID badges (upper torso)?

  • Are the HVAC ducts being stored in a manner that maintains duct cleanliness?

  • Are all installed HVAC ducts being securely covered to protect cleanliness?

  • Is the domestic plumbing being stored in a manner to protect pipe cleanliness?

  • Are all installed domestic plumbing pipes being securely covered to protect cleanliness?

Inspection Completion and Summary:

  • Was the site free of issues? If no, what were the issues?

  • What were the corrective actions taken to eliminate those?

  • Closing or Additional Comments?

Inspection Sign-off:

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.