Information
-
Inspection No.:
-
Inspection Date:
-
Project Name:
-
Client Name:
-
Inspection Conducted by:
-
Subcontractors onsite:
-
Note: Use of this form is not intended to be all encompassing, but is to be used to assist those responsible for implementation of safety procedures, practices , and general compliance with OSHA standards. This form will be used on a daily basis and all items noted for correction are to be monitored until noted as corrected on this form. A copy of this form is to remain onsite in the field office. Copy to main office and to any parties deemed necessary or appropriate.
General Observations:
-
Describe contractor activities:
-
Using floor plan location identifiers, describe construction traffic pathway. Note any healthcare staff traffic patterns that coincide with construction paths.
Project Observations:
-
Is the static pressure greater than -0.02"w.g. (list actual readings in comments, identify manometer by serial number and location)?
-
Is the manometer tubing connected properly?
-
Is the manometer calibration up to date (list last calibration date, identify the manometer by serial number)?
-
Do the negative air machine (NAM) and exhaust ducts have good integrity?
-
Have the NAM pre-filters changed per ICRA requirements?
-
Have the manometers alarm has not been silenced?
-
Has the NAM HEPA filters changed per manufacturers instructions?
-
Are the NAM's on emergency power?
-
Are the manometers on emergency power?
-
Is the anteroom clean, with no dust, or debris?
-
The anteroom and work area doors are not being opened at the same time?
-
The HEPA vacuum is operating properly?
-
The HEPA vacuum is being used by construction personnel when leaving the work area?
-
All contractor's equipment is clean when passing through common pathways (elevators/corridors)?
-
Is the work area is clean and orderly?
-
Are the contractors complying with the traffic patterns?
-
Are the adhesive mats being changed before becoming ineffective?
-
Are the Corredor's free of construction related dust or debris?
-
Do the interior containment walls have good integrity?
-
Do the exterior containment walls have good integrity?
-
Is the Environmental Containment Unit (ECU) being used appropriately?
-
Are the contractors clearly displaying their ID badges (upper torso)?
-
Are the HVAC ducts being stored in a manner that maintains duct cleanliness?
-
Are all installed HVAC ducts being securely covered to protect cleanliness?
-
Is the domestic plumbing being stored in a manner to protect pipe cleanliness?
-
Are all installed domestic plumbing pipes being securely covered to protect cleanliness?
Inspection Completion and Summary:
-
Was the site free of issues? If no, what were the issues?
-
What were the corrective actions taken to eliminate those?
-
Closing or Additional Comments?
Inspection Sign-off:
-
Signature: