Information
-
Site
-
Postcode:
-
Job Number Reference
-
Walk Off by:
-
Date of Walk Off:
Site Information
Site Information
-
G Network to provide incoming 12F Multicore, with a suitable amount of live fibres, as per Job Pack, left at the Toby Box Location. G Network to provide adequate length of 12F Multicore to reach to the required B.F.P (Building Fibre Demarcation Point) or F.S.B (Fibre Splice Box) SCCI to install Incoming 12F Multicore to agreed location, as per Job Pack SCCI to IOLM test ALL Flat Fibres SCCI to Live Power Test One Property per splitter installed. This Test will be conducted via connection to the C.S.P (Customer Splice Box) or directly to the Fibre Coil left for later installation, depending on Job Pack Design
-
Number of Dwellings
B.F.P (Building Fibre Demarcation Point) Information
-
B.F.P (Building Fibre Demarcation Point) Information
-
Photograph of B.F.P (Building Fibre Demarcation Point)
System Information
-
Number of DP's
DP number and Test Information
-
DP Number
-
Number of Properties served
-
One test to be carried out per splitter.
Test - Property Number
-
Test 1 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 2 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 3 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 4 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 5 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 6 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 7 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 8 - Property Number
-
Tested Type
-
Photographs at POE
Sign Off
Sign Off
-
Additional Notes / Information
-
Has the installation been completed as per the job pack provided?
-
Notes
-
Photograph of red line drawing
-
Name
-
Completed Sign Off