Information

  • Site

  • Postcode:

  • Job Number Reference

  • Walk Off by:

  • Date of Walk Off:

Access Requirements

Site Information

  • G Network to provide incoming 12F Multicore, with a suitable amount of live fibres, as per Job Pack, left at the Toby Box Location. G Network to provide adequate length of 12F Multicore to reach to the required B.F.P (Building Fibre Demarcation Point) or F.S.B (Fibre Splice Box) SCCI to install Incoming 12F Multicore to agreed location, as per Job Pack SCCI to IOLM Test ALL Flat Fibres SCCI to Live Power Test One Property per splitter installed. This Test will be conducted via connection to the P.O.E (Point of Entry) Box or directly to the Fibre Coil left for later installation, depending on Job Pack Design

  • Number of Dwellings

B.F.P (Building Fibre Demarcation Point) Information

  • B.F.P (Building Fibre Demarcation Point) Information

  • Photograph of B.F.P (Building Fibre Demarcation Point)

System Information

System Information

  • Number of DP's

  • DP
  • DP Number

  • DP Status

  • Brief explanation of work carried out

  • Photographs of DP

Sign Off

Sign Off

  • Additional Notes / Information

  • Has the installation been completed as per the job pack provided?

  • Notes

  • Photograph of red line drawing

  • Name

  • Completed Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.