1. Answer "Yes" or "No" on the questions below.
2. Add photos and notes by clicking on the paperclip icon
3. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority, and due date
4. Complete audit by providing digital signature
5. Share your report by exporting as PDF, Word, Excel or Web Link
FTTN
-
Site Address Validation
-
Is the site address correct?
-
Is the access information correct?
On siting Change Request
-
Node Obstructions
-
Are there obstructions?
-
Physical Node cabinet condition
-
Are there signs of damage or graffiti
-
Plinth integrity
-
Concrete plinth shows signs of cracking or erosion
-
Door alignment and operation
-
Is there evidence of tampering?
-
Galaxy locks
-
Does the lock need replacing?
-
Is there evidence of the door, hinge or lock not operating correctly?
-
Node Pest control
-
Is there evidence of spiders, rodents, snakes, ants etc?
-
Node door seal integrity
-
Are the cabinet seals clean?
-
Internal compartments
-
Is there dust, dirt or moisture in the cabinet?
-
Door Mesh
-
Is there rust evident on the mesh?
-
Air entry and exit
-
Are the air vents clean and unobstructed?
-
Are the copper fins and HEX clear?
-
Fan units
-
Are the fans working correctly?
-
Is any bearing or fan making an abnormal noise?
-
Circuit Breakers
-
Are blanking panels installed?
-
Rectifier units
-
Is the air intake free of obstructions and dust?
-
Is any bearing or fan making an abnormal noise?
-
ISAM inspection
-
Is dust or moisture visible?
-
Is any bearing or fan making an abnormal noise?
-
Filter Inspection
-
Is the filter clean?
-
Capped fibre ports
-
Are the fibre ports fitted with caps?
-
Blanking Panels
-
Do all unused slots have filler cards?
-
Battery compartment
-
Are the battery terminals corroded?
-
Are the battery cables intact?
-
Do the batteries have abnormalities?
-
Battery Cell Voltage
-
Are the individual cell voltages of the batteries around 13v per cell?
-
Battery Voltage
-
Is the battery voltage within the range of -40.5 volts to -60 volt?
-
Battery Current
-
Is the rectifier current within the range of -100Amp to 100Amp?
-
Incoming ducts
-
Are the glands sealed?
-
CCF OVP
-
Are the OVP modules fitted and not blown?
-
Can the OVP modules be pushed fully in?
-
CCF Splitters
-
Are the splitters firmly plugged in?
-
Earth cabling
-
Are the earth link connections secure?
-
Incoming AC Mains
-
Are the AC Mains terminal block and incoming AC mains cables secure and free from damage?
-
AC Mains Changeover
-
Is the AC mains generator changeover switch secure and free from damage?
-
Generator Plug / Socket
-
Is the generator plug (Alcatel/Nokia) or socket (Commscope) free from damage and serviceable?
On Completion
-
Close node cabinet
-
On completion of the work order tasks close and lock the cabinet door and take final picture.
-
Pause CRQ
-
Notify the FTTN NOC to advise them to pause the CRQ
-
Return key
-
Return any keys to the person who gave them to you.
-
Additional Comments
-