Title Page

  • NODE ID:

  • Company Name

  • Tech Name

  • Additional Tech Names

  • Conducted on

  • Prepared by

  • Location
  • INSTRUCTIONS

    1. Answer "Yes" or "No" on the questions below.
    2. Add photos and notes by clicking on the paperclip icon
    3. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority, and due date
    4. Complete audit by providing digital signature
    5. Share your report by exporting as PDF, Word, Excel or Web Link

FTTN

  • Site Address Validation

  • Is the site address correct?

  • Is the access information correct?

On siting Change Request

  • Node Obstructions

  • Are there obstructions?

  • Physical Node cabinet condition

  • Are there signs of damage or graffiti

  • Plinth integrity

  • Concrete plinth shows signs of cracking or erosion

  • Door alignment and operation

  • Is there evidence of tampering?

  • Galaxy locks

  • Does the lock need replacing?

  • Is there evidence of the door, hinge or lock not operating correctly?

  • Node Pest control

  • Is there evidence of spiders, rodents, snakes, ants etc?

  • Node door seal integrity

  • Are the cabinet seals clean?

  • Internal compartments

  • Is there dust, dirt or moisture in the cabinet?

  • Door Mesh

  • Is there rust evident on the mesh?

  • Air entry and exit

  • Are the air vents clean and unobstructed?

  • Are the copper fins and HEX clear?

  • Fan units

  • Are the fans working correctly?

  • Is any bearing or fan making an abnormal noise?

  • Circuit Breakers

  • Are blanking panels installed?

  • Rectifier units

  • Is the air intake free of obstructions and dust?

  • Is any bearing or fan making an abnormal noise?

  • ISAM inspection

  • Is dust or moisture visible?

  • Is any bearing or fan making an abnormal noise?

  • Filter Inspection

  • Is the filter clean?

  • Capped fibre ports

  • Are the fibre ports fitted with caps?

  • Blanking Panels

  • Do all unused slots have filler cards?

  • Battery compartment

  • Are the battery terminals corroded?

  • Are the battery cables intact?

  • Do the batteries have abnormalities?

  • Battery Cell Voltage

  • Are the individual cell voltages of the batteries around 13v per cell?

  • Battery Voltage

  • Is the battery voltage within the range of -40.5 volts to -60 volt?

  • Battery Current

  • Is the rectifier current within the range of -100Amp to 100Amp?

  • Incoming ducts

  • Are the glands sealed?

  • CCF OVP

  • Are the OVP modules fitted and not blown?

  • Can the OVP modules be pushed fully in?

  • CCF Splitters

  • Are the splitters firmly plugged in?

  • Earth cabling

  • Are the earth link connections secure?

  • Incoming AC Mains

  • Are the AC Mains terminal block and incoming AC mains cables secure and free from damage?

  • AC Mains Changeover

  • Is the AC mains generator changeover switch secure and free from damage?

  • Generator Plug / Socket

  • Is the generator plug (Alcatel/Nokia) or socket (Commscope) free from damage and serviceable?

On Completion

  • Close node cabinet

  • On completion of the work order tasks close and lock the cabinet door and take final picture.

  • Pause CRQ

  • Notify the FTTN NOC to advise them to pause the CRQ

  • Return key

  • Return any keys to the person who gave them to you.

  • Additional Comments

  • Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.